A245
A245 | |
---|---|
Information | |
Planner | AlphaDS Felix_An (Mountain View Section) AlikSong (Rosemont Section) Imperial_block ( XE38 Section) |
Constructors | AlphaDS Imperial_block (Exit 15, road signs in West Woodlands Highway portion and slabs) |
Helpers | AlphaDS Imperial_block Jasupa Caillou15 MC_Protocol Narnia17 LegendOfYukari _Mossie Oshawott_12 |
Number of Exits | 15 (Planned) |
Terminus West | A30 |
Terminus East | B246, Newfounded |
Status | |
Road Status | Open |
Extra Info | |
Alternative Names | Lapis Freeway West Woodlands Highway |
Route Length | ~10 km |
The A245 is an A-class highway from the B230 in Mountain View to Newfounded, passing through Lapis Bay.
History
The plan first appeared in November 2018 as A246 by Foote_Chicken, with a different routing which goes to Farwater. A246 was then approved in the February 2019 GSM, however, Foote_Chicken ditched the project in April 2019. In July 2019, a new plan of A245 with a similar route to A246 which starts from A30 to XE37 Foobar, passing by Farwater and Lapis Bay, was planned by AlphaDS and was proposed in the August 2019 GSM. The proposal was denied and seeing that there was no way to pass through Farwater and Los Angeles, AlphaDS seeked a new route for the project. The current route was planned as a result and the proposal of A245 was approved in the November 2019 GSM after it has been reproposed. A small section of road was built in the following week, however AlphaDS wanted to get Lapis Bay to Senator before continuing the highway. The construction came to a halt for 1.5 years until Lapis Bay achieved Senator in late January 2021. Construction quickly resumed afterwards.
Route
Construction Updates
- A rest stop, Sunset Pass was founded along the A245 to the east of XE33 on January 31, 2021. It became the first ranked rest stop on the server.
- On March 17th 2021, the section from Lapis Bay to Newfounded was completed, and a bus route between Bawktown and Lapis Bay was created temporary until the Tri Waters Rail is complete.
- Exits 7 and 8 would be skipped for now until future developments occur. They are currently reserved.
- Exit 6 opened on May 12th 2021, along with B240.
- Harmony Pacific Bridge completed on May 18th 2021.
- A small reroute near Mountain View approved in May 2021 ISM, merging portions of the B230 and terminating at A30.
- On July 15th 2021, exit 4 is complete, connecting the A245 to the main MRT road network.
Potential extensions
An extension from Newfounded to East Mesa had been discussed, but no plans has been made yet. The extension would double the length of the road to ~20 km and could potentially merge with the B246 for some sections.
Legend
Status | Exit number | Destinations | Road designation | Notes |
---|---|---|---|---|
X | Interchange Exit | No connections | ||
X | Standard Exit | No connections | ||
X | Rest Area Exit | No connections |
Exit Information
Status | Exit number | Destinations | Road designation | Notes |
---|---|---|---|---|
1A | South To Achowalogen Takachsin, Airchester, Wythern |
|||
1B | West To New Bakersville, Ravenna |
|||
2 | East To Peaslake, |
|||
3 | Mountain View | |||
4 | Valemount |
Eastmount Parkway | Inspired by a real life interchange in New Westminster, BC between Highway 91 and 91A | |
5 | Rosemont | |||
6 | East To Rodessa City |
|||
7 | Wilderness (planned) | Planned for future development use | ||
8 | Wilderness (planned) | Planned for future development use | ||
9 | South Lapis Bay - Venessa Bay, Mounty |
|||
10 | Lazure | |||
11 | Highlands | |||
12 | Sunset Pass | |||
13 | Taiga Hills | |||
14 | Miningstone Valley | |||
15A | B355 South North Bawktown (planned) |
B355 | No connection since the B355 has not been completed | |
15B | Newfounded | |||
15C | East To Bawktown |
|||
Eastern Terminus at and Newfounded |