Arrowhead Line

From Minecart Rapid Transit Wiki
Jump to navigation Jump to search

The Arrowhead Line is a half Cyan Systems, half Pacifica Transit built line serving as the main route between Spawn City and Ravenswood. Stations are located to encourage new cities in the land between Blue and Red Lines, with major transfer point located at Inchmuir with the MRT Blue Line and the Inchmuir Subway Network. Arrowhead Line at the SCTC complex is located on the Iron Level, on Platform E/F. At Inchmuir Central Station, Arrowhead Line is located on the Red Section of the Underground Concourses. Arrowhead Line is complete.

Ss (2013-12-20 at 03.01.44).png

The Station List is the following:

Status Code Station name Connections
Dynmap Green Flag.png A1 Arlington  TFMD 
Dynmap Green Flag.png A2 SCTC  G   IB01 
Dynmap Green Flag.png A3 Cinema Square  B   Y 
Dynmap Green Flag.png A4 South Bluemont  IB04 
Dynmap Green Flag.png AEX Bluemont  R   G   C 
Dynmap Green Flag.png A5 Inchmuir Central  B   C   EST   ISN   ISN   ISN   ISN   N1   JDT   QVL   M2 
Dynmap Green Flag.png A6 Wishington  B   JAV   M2 
Dynmap Green Flag.png A7 MegaTown  MLA   MLB   MLC   MLX   JAV 
Dynmap Green Flag.png A8 Ravenswood  MLA   ARC   JAV   IB03 

Arrowhead Shuttle

Arrowhead Shuttle is a shuttle service between Port Authority of Bluemont Transit Hub (also known as South Bluemont) and  G13  R8  Bluemont. Commuters from the east can choose to either continue on the Arrowhead Line towards SCTC or Arlington, or take the Arrowhead Shuttle to  G13  R8  Bluemont Bluemont MRT to transfer to the MRT Red and Green Lines, without getting out of the train. Inversely, Commuters from  G13  R8  Bluemont enjoy a one-seat ride to Ravenswood without any transfers.

Arrowhead Line News:

  • November 25, 2013: Phase 1 (Initial Tunneling) done. A message from _frozen follows:

"A ton of gratitude is owed to just_robinho (Arlington-SCTC Tunnel), colaja953 (Ravenswood-Inchmuir Tunnel) and tom_pairs (Inchmuir-SCTC Tunnel) for their worldediting work; without those people this will not be able to begin on its journey to the grand opening. Special thanks is also owed to TWO more people: thomasfyfe for clarifying and aligning the correct route through Inchmuir when there were concerns Arrowhead Line would run afoul of other lines; and for beeskee for taking up finishing touches between SCTC and Inchmuir when I was unexpectedly occupied. Many thanks to all of you!"

  • November 26, 2013: Line is now operational between Ravenswood and Arlington. Several Stations will be opening in this week in phases, to ensure service is maintained at a high level.
  • December 1, 2013: Arrowhead has all the stations placed. A new Arrowhead Line Shuttle to Bluemont is now in construction from Path Authority of Bluemont Transit Hub (South Bluemont). Once opened, commuters from the MRT station at Bluemont has a one-seat ride to Ravenswood via Arrowhead Line and vice versa. Many thanks to Yeamanator for his work with the stations!
  • December 7, 2013: Arrowhead Line is now fully open, with the last station opening at Wishington.
  • December 16, 2013: Arrowhead Shuttle, the last piece of the system, is complete. Thanks are due to Tom_Pairs for his work on this momentous occasion in Pacifica Transit's history.