B395

From Minecart Rapid Transit Wiki
Jump to navigation Jump to search
B395
Plannerskingsnake
lightshatterz
Constructorskingsnake
lightshatterz
_Mossie
DirectionEast-West
Number of exits8
Route
Western terminus B33 
Eastern terminusXjVille
Status
Road statusService Good.png Open

B395 is a highway connecting XjVille and B33. It serves as the main throughfare to the OctTowns area.

This is the Quad Bridges, a set of bridges that B395 uses.

Route

Prismarine

B395 starts at the roundabout, where the road meets with B33. Then, it heads north with an intersection with Prismarine's road system. North of Prismarine, it enters into a tunnel below the roofed forest.

Mediville

Upon exiting from the tunnel below the roofed forest, the road enters Mediville. In Mediville, it goes straight through Mulder Street. North of the town, it curves to the right and then descends into a swamp.

Yonge

After the road goes through the swamp with 3 bridges crossing above the swamp, it enters Yonge. In Yonge, it goes through Yonge Street for a short distance before it turns left to become Bloor Street, before entering a bridge crossing above Xj-Bloo River.

Blootown

After crossing the Xj-Bloo River, the road ends up in Blootown. After a right turn entering Blootown Main Street and the Blootown built-up area and the MRT station, the road leaves the built-up area, taking a scenic route before crossing the Xj-Bloo International River Crossing.

XjVille

After crossing the Xj-Bloo International River Crossing, the road enters XjVille. To the right is Xj Funland, before it terminates at a 3-way intersection with a leg linking to B395 Access Road and the XjVille street system, and another leg bypasses Xjville, which goes to Halfway before reaching its terminus.

History

After XjVille and Blootown were built, kingsnake offered to make a road connection connecting the towns. It was built in December 29-30, 2022 in order to take the title of "last road in 2022" from LondonThameslink and B15.

Following a proposal sent in January 23, 2023 by chimata, B395 was approved to be extended west to B33. It reached Mediville in January 30, 2023.

Since _Mossie went inactive, on October 21, 2023, chimata requested to takeover the segment that Mossie originally had. It was then accepted 17 hours later at 10:35 PM BST. The road was finally completed in November 1, 2023.