B813

From Minecart Rapid Transit Wiki
Jump to navigation Jump to search

The B813 is an east-west road that was originally planned to connect the towns of the large Mega Taiga biome to the northwest of Central City and is owned by Toth_1, who also led the building efforts. However, as of July 3rd, 2023, the segment to Spruce Valley has been canceled due to stagnation on the roads construction. What was able to be completed of this segment still is a part of B813, but it stops being signed after the intersection with B846 and Demeter Road. This thereby makes the B813 a one-town B-Road. It has 2 A-Road Style interchanges in Cattington.

Quick Facts

Road Number: B813

Official Road Name: Great Spruce Parkway, (in Cattington as a normal street) Main Street

Road Construction Status: Complete (Good Service)

Connections: B846

Length: Currently unavailable

Current Terminus 1: Cattington Wolf Peak District (Good service)

Current Terminus 2: (de jure) Spruce Valley (Canceled), (de facto) Ends abruptly east of Cattington (Good Service)

Interchange List

Note: Not included are the streets in Wolf Peak District of Cattington as they are too close together to be considered separate interchanges.

Begin B813 (Cattington)

1

Status: Completed

Type: At-Grade-Conventional interchange hybrid (whatever that is called).

Connections: Darwin Road

2

Status: Completed

Type: At-Grade

Connections: Einstein Street

3

Status: Completed

Type: At-Grade

Connections: Curie Street

4

Status: Completed

Type: Diamond (Because in-towns, B-roads can have A-Road style interchanges)

Connections: Newton Avenue

5

Status: Completed

Type: At-Grade

Connections: B846