User:Autobus/Sandbox

From Minecart Rapid Transit Wiki
Jump to navigation Jump to search

Template Sandbox

NEW OPTION 2

42
Station Info Location map Photo
Station Owner: RaiLinQ
Ticket Office:
Step-Free Access:
Toilets:
Bike Parking:
Food & Drinks:
Other Stores:
BusLinQ IC Connection:
AquaLinQ Connection:
X 42.png 42 2.png

NEW OPTION 1

42
Facilities Location map Photo
X 42.png 42 2.png

OLD

42

42

Station (Front View) Station (Overview) Location map
42 2.png 42 1.png X 42.png

Train Lines: Intercity

IC 0100: Wazamawazi - Whiteley

   IC 0100   MidMRT Mainline 
Wazamawazi Queen Maxima - Whiteley Turing Square
Operating CompanyRaiLinQ
First Opened11 December 2015
Finished at4 October 2019
Train TypeIntercity
Stock UsedE100 Engine + 4*CA1-DD cariage
Status:Service Good.png Open
Frequencies
Rush Hour4*Hour
Monday-Friday4*Hour
Evening2-4*Hour
Saturday4*Hour
Sunday4*Hour

Open WheelTerm.png Wazamawazi Queen Maxima
Open Wheelchair.png Calbar Arena
Open Wheelchair.png Laclede Central
Open Wheelchair.png Christi
Open Wheelchair.png Mons Pratus
Open Wheelchair.png Grayzen
Open Wheelchair.png Merchant City
Open Line.png ATC International Airport
Open Wheelchair.png San Reinoldi
Open Wheelchair.png Siletz Central
Open Wheelchair.png Astoria
Open Wheelchair.png Elecna Bay North
Open Wheelchair.png Venceslo Ferrocaril Center
Open WheelTermB.png Whiteley Turing Square

Information

This line is the result of various line changes and re-routings due to various situations at 16 November 2015. At December 11 2015 the first 2 stations opened their doors on this line; Wazamawazi Queen Maxima and Calbar Arena. Almost a year later at 20 November 2016 Laclede Central opened as the third station. Over a year later at 25 February 2018 Christi and Mons Pratus stations opened on this line. At 6 May 2018 Grayzen station opened. At 16 June 2018 Merchant City opened. Fun Fact: Merchant City was the planned terminus of the first RaiLinQ line ever planned. At October 5th 2018 Venceslo Ferrocaril Center and Whiteley Turing Square stations opened seperated from the other section of this line. Please reference the current operations map to see what your travel options are. At June 21st 2019 ATC International Airport and San Reinoldi Stations opened. At june 26nd 2019, Siletz Central opened on this line. At july 31st 2019 Astoria station opened. At 26 September 2019 Elecna Bay North Station opened. The final section between Elecna Bay North and Venceslo Ferrocaril Center (both stations where open before but unconnected) where connected at October 04th 2019.

IC 0200: Roke - Whiteley

   IC 0200   North-South Mainline 
Roke - Whiteley Turing Square
Operating CompanyRaiLinQ
First Opened20 December 2016
Finished at6 September 2017
Train TypeIntercity
Stock UsedS310 + 3*CA8DD
Status:Service Good.png Open
Frequencies
Rush Hour4*Hour
Monday-Friday4*Hour
Evening2-4*Hour
Saturday4*Hour
Sunday4*Hour

Open WheelTerm.png Whiteley Turing Square
Open Wheelchair.png Mallison
Open Wheelchair.png Paixton
Open Wheelchair.png Bexley Central
Open Wheelchair.png Utopia Stephenson
Open Line.png Sealane Central
Open Wheelchair.png Xilia Nation
Open Wheelchair.png Christi
Open Wheelchair.png Laclede Central
Open Wheelchair.png Leydon Airport
Open Wheelchair.png Birchview Central
Open Wheelchair.png Dandenong
Open Wheelchair.png New Phoenix
Open Wheelchair.png St. Anna Mercy General
Open Line.png Banana
Open Wheelchair.png Enspington
Open Wheelchair.png Ravenna Sports Park
Open Wheelchair.png Titsensaki
Open Wheelchair.png Old Verdantium
Open WheelTermB.png Roke (AquaLinQ Connection)

Information

This line is the result of various line changes and re-routings due to various situations at 16 November 2015. At December 20th 2016 finally the first section of the line opened between Birchview and Dandenong. On February 1st 2017 Dandenong - Benion opened additionally which closed subsequently on February 2nd 2017 after issues with Benion station ownership. (The City claimed they had full ownership over the station and trains pasted into it and told RaiLinQ quite literally to Fuck Off out of Benion. According to ridership numbers Benion station was never used by a passanger on the day it was open. At April 12th 2017 New Phoenix Station opened. At April 13th 2017 Banana station Opened. At April 16th 2017 Enspington station opened. At July 3rd 2017 the section between Sealane Central and Utopia meaning the line now has 2 different operational sections. Ravenna Sports park and Titsensaki on the northern end of the northern operating portion opened on 6th of July 2017. On July 17th Old Verdantium Station opened. On july 18th Roke station opened, the final northern Terminus of this line. On September 6th 2017 the rest of the line opened to make the line fully operational. (Xilia Nation, Christi, Laclede Central, Leydon Airport) At November 13th 2017 an additional stop in St. Anna opened along the line between New Phoenix and Banana, being called St. Anna Mercy General. At 26 September 2018, Utopia station was renamed to Utopia Stephenson station to avoid confusion with other stations in Utopia. At 17 September 2019 it was merged with the old Intercity 0300 meaning the old stops of the Intercity 0300 where added onto the line: Bexley Central, Paixton, Mallison and Whiteley Turing Square. This merging also meant a change of stock given part of this route is not electrified, and the line from this point on runs with brand new Hybrid (Bi-Mode) trains.

IC 0400: Utopia - Mason City

   IC 0400   Eastern City Line 
Utopia Stephenson - Mason City King Redtie III
Operating CompanyRaiLinQ
First Opened15 January 2019
Finished at29 January 2020
Train TypeIntercity
Stock UsedRa7HS
Status:Service Good.png Open
Frequencies
Rush Hour4*Hour
Monday-Friday4*Hour
Evening2-4*Hour
Saturday4*Hour
Sunday4*Hour

Open WheelTerm.png Utopia Stephenson
Open Wheelchair.png Dabecco Central
Open Wheelchair.png San Reinoldi
Open Wheelchair.png Scarborough Denzil Junction
Open Wheelchair.png Saint Roux Gare Orsay
Open Wheelchair.png Freedon Barfing Rainbow Fields
Open Wheelchair.png Airchester Central
Open Wheelchair.png Ellesume Central
Open WheelTermB.png Mason City King Redtie III

Information

This line is the result of various line changes and re-routings due to various situations at 16 November 2015. After being planned for a really long time the line this line has not yet come into operation. At 15 January 2019 Utopia Stephenson, Dabecco Central and San Reinoldi stations opened. At 25 May 2019 an isolated section on the line opens between Mason City King Redtie III, Ellesume Central, Airchester Central and Freedon Barfing Rainbow Fields Stations. At 18th November 2019 Saint Roux Gare Orsay opened. At 29th January 2020 the last station on the line: Scarborough Denzil Junction opened.

IC 0500: Whiteley - Bronte

   IC 0500   Southside Mainline 
Whiteley College Park - Bronte
Operating CompanyRaiLinQ
First Opened5 October 2018
Finished at-
Train TypeIntercity
Stock UsedE7-110 + 6*CA7-S
Status:Service Partial.png Partially open
Frequencies
Rush Hour4*Hour
Monday-Friday4*Hour
Evening2-4*Hour
Saturday4*Hour
Sunday4*Hour

Open WheelTerm.png Whiteley College Park
Open Wheelchair.png Venceslo Ferrocaril Center
Open Wheelchair.png Downsview
Open Wheelchair.png Genesis
Open Wheelchair.png Isle of Chez
Open Wheelchair.png Elecna Bay North
Closed Line.png Fort Yaxier
Closed Line.png Pearl Coast
Closed TermB.PNG Bronte

Information

At 5 October 2018 the line first opened between Whiteley College Park and Venceslo Ferrocaril Stations. At 5 October 2019 the line was extended to Elecna Bay North causing the opening of Downsview, Genesis, Isle of Chez and Elecna Bay North on this line.

IC 0600: San Reinoldi - Sunshine Coast

(Southeastern Line)

Train Lines: Stoptrain

ST 1100: Wazamawazi - Mason City

   ST 1100   MidMRT Mainline 
Wazamawazi Queen Maxima - Mason City King Redtie III
Operating CompanyRaiLinQ
First Opened26 November 2015
Finished at23 March 2019
Train TypeStoptrain
Stock UsedRA1-2e + RA1-2e
Status:Service Good.png Open
Frequencies
Rush Hour4*Hour
Monday-Friday4*Hour
Evening2-4*Hour
Saturday4*Hour
Sunday4*Hour

Open WheelTerm.png Wazamawazi Queen Maxima
Open Wheelchair.png West Calbar
Open Wheelchair.png Calbar Arena
Open Wheelchair.png Amestris
Open Wheelchair.png Laclede West
Open Wheelchair.png Laclede Central
Open Line.png Laclede South
Open Wheelchair.png Christi
Open Line.png Mons Pratus Sports Park
Open Wheelchair.png Mons Pratus
Open Wheelchair.png Alienor
Open Wheelchair.png Grayzen
Open Wheelchair.png Grayzen Laminole
Open Line.png Williamsburg
Open Wheelchair.png Digipool
Open Wheelchair.png Merchant City
Open Line.png Achowalogen Takachsin Western Transportation Hub
Open Line.png Downtown Achowalogen Takachsin/Covina
Open Line.png Achowalogen Takachsin Suburb
Open Line.png Downtown Solarion
Open Line.png Outer Solarion
Open Wheelchair.png Ellesume Central
Open Wheelchair.png Mason City Airport
Open Wheelchair.png North Haven
Open WheelTermB.png Mason City King Redtie III

Information

This line is the result of various line changes and re-routings due to various situations at 16 November 2015. The first section between Wazamawazi QM and West Calbar opened 10 days later at November 26th and to Calbar Arena at 11 December 2015. Amestris after some short negotiations opened at February 4th 2016. Laclede West first was cancelled and after a wait and a lot of negotiating the station opened at September 15th 2016 and has one of the longest staircases on the network. At november 20th 2016 the section to Laclede Central, well over 2 years after construction of the station finally opened to the public. At April 12th 2017 Laclede South station opened in the south of the city of Laclede. At June 18th 2017 Christi Station Opened. At March 1st 2018 Mons Pratus and Mons Pratus Sports Park opened. At May 6th Grayzen Station Opened. At June 20th Merchant City, Grayzen Laminole, Williamsburg and Digipool stations opened. Alienor Station opened at 21 February 2019 between Grayzen and Mons Pratus after it became clear that the seperate line to Alienor would not be made due to a lack of platform availability at Grayzen. At 16 March 2019 the following Stations opened on this line: Achowalogen Takachsin Western Transportation Hub, Downtown Achowalogen Takachsin, Achowalogen Takachsin Suburb, Downtown Solarion, Outer Solarion and Ellesume Central. At 23 March 2019 Mason City Airport, North Haven and Mason City King Redtie III stations opened finally finishing the line after well over three years of work.

ST 1200: Merchant City - Fort Yaxier

   ST 1200   MidMRT Mainline 
Merchant City - Fort Yaxier
Operating CompanyRaiLinQ
First Opened23 June 2019
Finished at-
Train TypeStoptrain
Stock UsedRA8-4
Status:Service Partial.png Partially open
Frequencies
Rush Hour4*Hour
Monday-Friday4*Hour
Evening2-4*Hour
Saturday4*Hour
Sunday4*Hour

Open WheelTerm.png Merchant City
Open Line.png ATC International Airport
Open Wheelchair.png Nihongo
Open Wheelchair.png Lochminehead
Open Wheelchair.png Woodsbane
Open Wheelchair.png San Reinoldi Airport
Open Wheelchair.png San Reinoldi
Open Wheelchair.png Siletz Central
Open Wheelchair.png Royalston
Open Wheelchair.png Palestropol
Open Wheelchair.png Southport
Open Wheelchair.png Barken
Open Wheelchair.png Rockham
Open Wheelchair.png Haibian
Open Wheelchair.png Sydney
Open Wheelchair.png Astoria
Open Wheelchair.png Elecna Bay Olympic Park
Open Wheelchair.png Elecna Bay North
Closed Line.png Elecna Bay Strand
Closed Line.png Elecna Bay Waterport
Closed Line.png Elecna Bay Westside
Closed Line.png Elecna Bay International Airport
Closed TermB.PNG Fort Yaxier

Information

This line is the result of various line changes and re-routings due to various situations at 16 November 2015. The first section between Merchant City, ATC International Airport, Nihongo, Lochminehead, Woodsbane, San Reinoldi Airport and San Reinoldi stations opened on June 23rd 2019. Siletz Central opened on June 26nd 2019. Royalston station opened on July 1st 2019. Palestropol, Southport, Barken, Rockham and Haibian stations opened on July 26th 2019. On July 30th 2019, Astoria and Sydney stations opened. At 26 August 2019 Elecna Bay Olympic Park and Elecna Bay North stations opened.

ST 1300: Utopia - Chalxior

   ST 1300   North-South Mainline 
Utopia Stephenson - Chalxior
Operating CompanyRaiLinQ
First Opened4 July 2017
Finished at24 September 2017
Train TypeStoptrain
Stock UsedRA4-4
Status:Service Good.png Open
Frequencies
Rush Hour4*Hour
Monday-Friday4*Hour
Evening2-4*Hour
Saturday4*Hour
Sunday4*Hour

Open WheelTerm.png Utopia Stephenson
Open Wheelchair.png UCWTIA/Greenmount
Open Line.png Sealane Central
Open Wheelchair.png Oakburgh
Open Wheelchair.png Xilia Nation
Open Wheelchair.png Basking Ridge
Open Wheelchair.png Cornus
Open Wheelchair.png Christi
Open Wheelchair.png Laclede Central
Open Wheelchair.png Laclede North
Open Wheelchair.png Tetrapolis
Open Wheelchair.png Bakersville Town
Open Line.png Bakersville Heights
Open Wheelchair.png Leydon Airport
Open Wheelchair.png Birchview South
Open Wheelchair.png Birchview Central
Open Wheelchair.png Heights City
Open Wheelchair.png Quiris Junction
Open Wheelchair.png Quiris North
Open Wheelchair.png Liten
Open Wheelchair.png New Acreadium Schiphol
Open Wheelchair.png New Acreadium Hofplein
Open Wheelchair.png New Acreadium Eemshaven (AquaLinQ Connection)
Open Wheelchair.png Pilmont Elizabeth Interchange
Open WheelTermB.png Chalxior

Information

This line is the result of various line changes and re-routings due to various situations at 16 November 2015. The first section between Utopia - UCWTIA/A5 - Sealane Central was finally opened at 4th of July 2017. UCWTIA/A5 was renamed to UCWTIA/Greenmount at august 10th 2017 and a direct metro line to greenmount (400 blocks away from the station) is under construction. At 6th September 2017 10 new stations opened: Birchview South, Leydon Airport, Bakersville Heights, Bakersville Town, Tetrapolis, Laclede North, Cornus, Basking Ridge, Xilia Nation and Oakburgh. At 7 September 2017 Heights City Station opened. At 10 September 2017 Quiris Junction, Quiris North and Liten stations opened. Pilmont opened at 23 September 2017. Chalxior opened at 24 September 2017. At 31 January 2018 an additional stop opened on the existing line at New Acreadium (New Acreadium Hofplein). At 26 September 2018, Utopia station was renamed to Utopia Stephenson station to avoid confusion with other stations in Utopia. At 11 March 2019, an additional stop opened in New Acreadium to facilitate the exchange with the line to Moramoa which did not fit in New Acreadium Hofplein Station and to serve the local airfield: New Acreadium Schiphol Station. This station is loosely based on the real life station of Nijkerk in The Netherlands. At 17 September 2020 another additional stop opened in New Acreadium (New Acreadium Eemshaven) to facilitate an exchange with AquaLinQ towards various destinations.

ST 1400: San Reinoldi - Ellesume

   ST 1400   Eastern City Line 
San Reinoldi - Ellesume Central
Operating CompanyRaiLinQ
First Opened5 May 2019
Finished at5 February 2020
Train TypeStoptrain
Stock UsedRA8-2
Status:Service Good.png Open
Frequencies
Rush Hour4*Hour
Monday-Friday4*Hour
Evening2-4*Hour
Saturday4*Hour
Sunday4*Hour

Open WheelTerm.png Ellesume Central
Open Wheelchair.png Sesby MRT Warptrain Museum
Open Wheelchair.png Sesby Central
Open Wheelchair.png Airchester Central
Open Wheelchair.png Airchester Poem Wall
Open Wheelchair.png Accerton
Open Wheelchair.png Castlecombe
Open Wheelchair.png Freedon Silverwood
Open Wheelchair.png Freedon Quartzwood
Open Wheelchair.png Freedon Barfing Rainbow Fields
Open Wheelchair.png Phos City
Open Wheelchair.png Izumo
Open Wheelchair.png Saint Roux Gare Orsay
Open Wheelchair.png Montagnas
Open Wheelchair.png Scarborough Denzil Junction
Open Wheelchair.png Scarborough North
Open Wheelchair.png Beaufort
Open Wheelchair.png San Reinoldi Alcala Estacio
Open Wheelchair.png San Reinoldi Limone
Open WheelTermB.png San Reinoldi

Information

This line is part of the local version of Intercity 0400. Ellesume Central, Sesby MRT Warptrain Museum, Sesby Central, Airchester Central, Airchester Poem Wall and Accerton stations all opened on this line on the 5th of May 2019. Castlecombe followed later that same day. Freedon Silverwood, Freedon Quartzwood and Freedon Barfing Rainbow Fields Stations opened on the 25th of May 2019. At 18 November 2019 Phos City, Izumo and Saint Roux Gare Orsay opened. The line was finally extended to Montagnas, Scarborough Denzil Junction, Scarborough North, Beaufort, San Reinoldi Alcala Estacio, San Reinoldi Limone and San Reinoldi on the 5th of February 2020.

ST 2000: Wazamawazi - Birchview

   ST 2000   North-Western Line 
Wazamawazi Queen Maxima - Birchview Central
Operating CompanyRaiLinQ
First Opened3 July 2016
Finished at19 December 2016
Train TypeStoptrain
Stock UsedRA3-2 + RA3-2
Status:Service Good.png Open
Frequencies
Rush Hour4*Hour
Monday-Friday4*Hour
Evening2-4*Hour
Saturday4*Hour
Sunday4*Hour

Open WheelTerm.png Wazamawazi Queen Maxima
Open Line.png Wazamawazi Airport
Open Wheelchair.png Jeeka
Open Wheelchair.png Vault City
Open Line.png Newton Le Willows
Open Wheelchair.png Armada
Open Line.png Orio and Waterville
Open Wheelchair.png Horizon Junction
Open Wheelchair.png Birch Forest City
Open Wheelchair.png Woodsdale
Open WheelTermB.png Birchview Central

Information

This line is the result of various line changes and re-routings due to various situations at 16 November 2015. The second section between Wazamawazi QM and Wazamawazi Airport at July Third 2016 after the first section (with an old station in Jeeka) had been closed due to the construction of said airport. Later that day the line also opened to the new Jeeka station and Newton Le Willows. At November 18th 2016 Armada station opened to the west side of Armada equipped with heat trapping doors. The line was extended to Orio and Waterville station that same day. Almost a month later at December 12th 2016 Lanark Junction station opened it's doors to be renamed at December 15th 2016 to Horizon Junction to reference the nearby Airport that also is connected with a walkway to the station. Again 3 days later at December 18th 2016 Woodsdale station opened and one day later the line was finished all the way up to Birchview Central at December 19th 2016. At September 11th 2017 an extra station was opened at Vault City. At June 6th 2018 an extra station was opened at Birch Forest City.

ST 2100: Astoria - Bronte

(Pearl Line)

ST 3000: Armada - Snowtopic

   ST 3000   Snowtopic Branch 
Armada - Snowtopic
Operating CompanyRaiLinQ
First Opened20 November 2016
Finished at20 November 2016
Train TypeStoptrain
Stock UsedRA5-2pcr
Status:Service Good.png Open
Frequencies
Rush Hour2*Hour
Monday-Friday2*Hour
Evening2*Hour
Saturday2*Hour
Sunday2*Hour

Open WheelTerm.png Snowtopic
Open WheelTermB.png Armada

Information

This line is the result of various line changes and re-routings due to various situations at 16 November 2015. It used to go from Wazamawazi to Snowtopic via Armada. With the addition of multiple stations between wazamawazi and Armada it was chosen to split the line. The line is fully single tracked and electrified but services are done with a cheap low capacity diesel railbus to cover for the costs of operating trains on such a short line. The trip takes just 4 minutes per direction and the whole train is services by just a single train. As an additional oddity the line is completely disconnected from the network, to get trains on the line or away for service a crane would need to be used to get the train off the bridge in snowtopic. The line was fully opened just over a year after being re-planned at 20 November 2016.

ST 3200: Ezzo City - Moton

   ST 3200   Vermilion City Line 
Ezzo City - Moton
Operating CompanyRaiLinQ
First Opened5 May 2018
Finished at21 September 2018
Train TypeStoptrain
Stock UsedClass 153
Status:Service Good.png Open
Frequencies
Rush Hour2*Hour
Monday-Friday2*Hour
Evening1-2*Hour
Saturday1-2*Hour
Sunday1-2*Hour

Open WheelTerm.png Moton
Open Wheelchair.png Morihama (AquaLinQ Connection)
Open Wheelchair.png Merced
Open Wheelchair.png Oasis Sands
Open Line.png Savacaci
Open Wheelchair.png Seaview
Open Wheelchair.png Pixl
Open Wheelchair.png Vekta And Xandar
Open Wheelchair.png Vekta North
Open Wheelchair.png West Vermilion
Open Wheelchair.png Vermilion Airport
Open Line.png Cinnabar Island
Open WheelTermB.png Ezzo City

Information

This line was born all the way at the beginning and except for adding more stops was pretty much unchanged since June 10th 2015. The First bit opened at 5 May 2018. This includes Vekta & Xandar Station, West Vermilion Station and Vermilion Airport Station. Cinnabar Island and Ezzo City Stations opened on the 11th of May 2018. Vekta North station opened on the 18th of May 2018. Vekta North Station was entirely made without the use of World Edit, including the train "pasted" there, which was copied by hand. Pixl Station was opened at the 20th of May 2018. Seaview Station was opened at the 25th of May 2018. Savacaci Station was opened at the 28th of May 2018. Oasis Sands Station was opened at the 29th of May 2018. Merced station was opened on 28 August 2018. Morihama station was opened at 19 September 2018. Moton station was opened at 21 September 2018, finishing the line. On 22 September 2018 AquaLinQ now connects to the network at Morihama station.

ST 3300: Wazamawazi - Daneburg

   ST 3300   Daneburg Line 
Wazamawazi Queen Maxima - Daneburg Central
Operating CompanyRaiLinQ
First Opened19 November 2015
Finished at13 March 2016
Train TypeStoptrain
Stock UsedLR-V-RLQ
Status:Service Good.png Open
Frequencies
Rush Hour2*Hour
Monday-Friday2*Hour
Evening2*Hour
Saturday2*Hour
Sunday2*Hour

Open WheelTerm.png Wazamawazi Queen Maxima
Open Wheelchair.png Westcross Transferium
Open Wheelchair.png Ilirea West
Open Wheelchair.png Vekta And Xandar
Open Wheelchair.png Pixl East
Open Wheelchair.png Espil North-East
Open Wheelchair.png Espil Airport
Open Line.png Waverly Junction
Open Line.png Daneburg East
Open TermB.PNG Daneburg Central

Information

This line was born all the way at the beginning and except for adding more stops was pretty much unchanged since June 10th 2015. The first station opened at November 19th 2015 between Wazamawazi Queen Maxima and Westcross Transferium. It opened to Ilirea at December 13th 2015. At February 7th 2016 vekta and Xandar Station was opened to be followed later the same day by Espil North/East with Espil Doublis Road and Daneburg East opening in the last specs of light of that same day. At 13th March the last station, Daneburg Central opened. At September 24th 2016 Doublis Road station closed to be replaced by Espil Airport at September 27th 2016. At 25 July 2017 Waverly Junction station opened between Daneburg East and Espil Airport. You can exchange here for IntraRail services to Waverly in a rare act of working together between competing companies. This new station has no road access and by that is not Wheelchair accessible from entrance to platform, meaning it is not listed as wheelchair accessible even though it is wheelchair accessible as an exchange. At 30 January 2019 the line went into renovations to add a new station and make improvements in the accessibility of various stations along the line. These works where finished at 9 Feburary 2019 and with that came the opening of a new station: Pixl East. With this the old rolling stock (D55 Engine + 2*Ca1 Cariage) was replaced by a LR-V-RLQ DMU.

ST 3400: Bexley - Daneburg

   ST 3400   Kolpino Branch 
Bexley Central - Daneburg Central
Operating CompanyRaiLinQ
First Opened19 November 2016
Finished at5 March 2017
Train TypeStoptrain
Stock UsedRA2-3
Status:Service Good.png Open
Frequencies
Rush Hour2*Hour
Monday-Friday2*Hour
Evening2*Hour
Saturday2*Hour
Sunday2*Hour

Open WheelTerm.png Bexley Central
Open Line.png Kolpino Airport
Open Wheelchair.png Kolpino City
Open Wheelchair.png Kolpino Embassy Lane
Open Wheelchair.png Helix Bay North
Open TermB.PNG Daneburg Central

Information

This line came about at April 8th 2016 after Bexley became one of the southern planned hubs and construction started later that year with Daneburg Central - Kolpino Airport opening at November 19 2016. At March 5th 2017 the line fully opened to Bexley central. At April 10th 2017 Helix Bay North finally opened after being around for a while but unable to be operated to due to the towns low rank. The GSM at april 9th changed that.

ST 3500: Bexley - Falloway

   ST 3500   Fish & Chips Branch 
Bexley Central - Falloway
Operating CompanyRaiLinQ
First Opened10 April 2017
Finished at25 July 2017
Train TypeStoptrain
Stock UsedRA2-3
Status:Service Good.png Open
Frequencies
Rush Hour2*Hour
Monday-Friday2*Hour
Evening2*Hour
Saturday2*Hour
Sunday2*Hour

Open WheelTerm.png Bexley Central
Open Wheelchair.png Bexley West
Open Wheelchair.png Bexley Colorside
Open Line.png Janghwa City
Open Line.png Southton
Open WheelTermB.png Falloway

Information

Bexley Central - Bexley West opened at 10th April 2017. Bexley West - Bexley Colorside - Southton - Falloway opened at 25th July 2017. Janghwa City Station opened at 12 October 2018, as a new extra stop between Bexley Colorside and Southton.

ST 3600: Bexley - San Reinoldi

   ST 3600   Branch Of The Acacia Diesels 
Bexley Central - San Reinoldi
Operating CompanyRaiLinQ
First Opened11 July 2017
Finished at15 January 2019
Train TypeStoptrain
Stock UsedRA1-2 + RA1-1
Status:Service Good.png Open
Frequencies
Rush Hour2*Hour
Monday-Friday2*Hour
Evening2*Hour
Saturday2*Hour
Sunday2*Hour

Open WheelTerm.png Bexley Central
Open Wheelchair.png Utopia Stephenson
Open Wheelchair.png East End
Open Wheelchair.png Matheson North Kinison
Open Wheelchair.png Oakley Union
Open Wheelchair.png Summerville - Ulfthorp
Open Wheelchair.png Dabecco Keenan Court
Open Wheelchair.png Dabecco Central
Open Wheelchair.png Dabecco Library
Open Line.png Siletz North
Open WheelTermB.png San Reinoldi

Information

Line opened between Bexley, Utopia and East End at July 12th 2017, Matheson North Kinison Station opened at 18 September 2018. At 26 September 2018, Utopia station was renamed to Utopia Stephenson station to avoid confusion with other stations in Utopia. At 15 January 2019 the line fully opened all the way to San Reinoldi including new intermediate stops at Summerville, Dabecco Keenan Court, Dabecco Central, Dabecco Library and Siletz North. Oakley Union, the third RaiLinQ station ever created from before the time warptrains had to have physical connections also re-opened as an intermediate station on this line after sitting empty for over 3 years at 15 January 2019. At 27th June 2019 Summerville station was renamed to Summerville - Ulfthorp to help differentiate between the two towns named Summerville on the server.

ST 3700: Utopia - Formosa

   ST 3700   Utopia Central Branch 
Utopia Central - Formosa Capital
Operating CompanyRaiLinQ
First Opened5 October 2018
Finished at5 October 2018
Train TypeStoptrain
Stock UsedRA6-1m1
Status:Service Good.png Open
Frequencies
Rush Hour2*Hour
Monday-Friday2*Hour
Evening2*Hour
Saturday2*Hour
Sunday2*Hour

Open WheelTerm.png Formosa Capital
Open Wheelchair.png Little Italy
Open Line.png Sealane North
Open Line.png Sealane Central
Open Wheelchair.png Pieville The Mudpie
Open Wheelchair.png Segville International
Open Wheelchair.png Utopia IKEA
Open Wheelchair.png Utopia Stephenson
Open WheelTermB.png Utopia Central

Information

This line is the final result of years of changing plans in the area, replacing the various planned lines that have over time planned to serve the Formosa Capital - Sealane Central section, Sealane Central - Segville section and the Utopia Central - Utopia Stephenson section. At 5 October 2018 the entire line opened with all it's stations: Formosa Capital, Little Italy, Sealane North, Sealane Central, Pieville The Mudpie, Segville International, Utopia IKEA, Utopia Stephenson and Utopia Central, which is actually the first RaiLinQ station ever constructed and had closed originally on a line from Sealane to Utopia, after a rule was put in place on the server causing the need for all warptrain stations to be connected back in 2015, which is with the opening of this line finally back in service.

ST 3800: Serena - Formosa

(New Terra Branch)

ST 3900: San Reinoldi - Vergil & Melrose

   ST 3900   Vergil & Melrose Branch 
San Reinoldi - Vergil & Melrose
Operating CompanyRaiLinQ
First Opened29 January 2019
Finished at21 February 2019
Train TypeStoptrain
Stock UsedRA5-1Pcr
Status:Service Good.png Open
Frequencies
Rush Hour2*Hour
Monday-Friday2*Hour
Evening2*Hour
Saturday2*Hour
Sunday2*Hour

Open WheelTerm.png San Reinoldi
Open Wheelchair.png Loudoun
Open WheelTermB.png Vergil & Melrose

Information

Vegil & Melrose where first intended to be served in the very first RaiLinQ route planning but then it was chosen to move the mainly in the east further west to go past Appleton and San Reinoldi instead in 2015. A replacement was planned to serve these two towns on a small branch line coming from Appleton which was shortely after cancelled because Appleton was destroyed in it's entirety to make way for Covina's ATC Airport which at the time wouldn't get a warptrain station (it did get one later in 2018). To still reach the towns of Vergil & Melrose the terminus of the branch line was moved from Appleton to San Reinoldi and the line would from now on also be planned to serve Loudoun. Construction on the line started in late 2018, despite the fact Melrose at this point in time didn't exist anymore at all and Vergil was removed and it becoming a district in the south of Covina, the old station terminus at Vergil & Melrose was chosen to have it's name remain the same, now being next to Melrose transportation center in the district of Vergil in Covina. The section between San Reinoldi and Loudoun opened on 29 January 2019. Vergil & Melrose Station opened at 21 February 2019 connecting to Loudoun with one of the longest diagonal warptrain tunnels on the server.

ST 4000: Wazamawazi - Moton

   ST 4000   CrossLinQ Line 
Wazamawazi Queen Maxima - Moton
Operating CompanyRaiLinQ
First Opened19 June 2017
Finished at17 June 2019
Train TypeStoptrain
Stock UsedClass 153
Status:Service Good.png Open
Frequencies
Rush Hour1*Hour
Monday-Friday1*Hour
Evening1*Hour
Saturday1*Hour
Sunday1*Hour

Open WheelTerm.png Wazamawazi Queen Maxima (Low Level)
Open Wheelchair.png Wazamawazi-Spring Valley
Open Line.png Spring Valley University
Open Wheelchair.png Spring Valley Airfield
Open Line.png Nauvis
Open Line.png Moleville
Open Line.png Jeb
Open Wheelchair.png Aquamarine Bay
Open Wheelchair.png Moton Bay
Open WheelTermB.png Moton

Information

Spring Valley and Wazamawazi West stations where constructed back in 2015. 21 months later at June 19th 2017 the line was finished and opened completely. At January 6th 2019 the station was renamed to Wazamawazi-Spring Valley to reflect the nearby MRT Station. At May 7th 2019 Spring Valley was renamed to Spring Valley University, the originally intended name. At May 7th 2019 as well Spring Valley Airfield, Nauvis and Moleville stations opened. At May 11th 2019 Jeb and Aquamarine Bay stations opened. At June 17th Moton Bay and Moton stations opened, finishing the line.

ST 4100: Sealane - Ashmore

(Sprucemore Line)

ST 4200: Whiteley - Birdhall

(Mesa Line)

ST 4300: Wazamawazi - Fortaleza

   ST 4300   Cinnamon Line 
Wazamawazi Queen Maxima - Fortaleza Frontale
Operating CompanyRaiLinQ
First Opened19 June 2017
Finished at6 October 2019
Train TypeStoptrain
Stock UsedClass 153
Status:Service Good.png Open
Frequencies
Rush Hour2*Hour
Monday-Friday2*Hour
Evening2*Hour
Saturday2*Hour
Sunday2*Hour

Open WheelTerm.png Wazamawazi Queen Maxima
Open Wheelchair.png Storalisburg
Open WheelTermB.png Fortaleza Frontale

Information

Storalisburg station has a long history as you can see on the memorial plaque on the station. The line opened on 19 June 2017. Fortaleza Frontale Station was added as a planned extention to the line in late September 2019 as this would be the easiest way to connect the town of Fortaleza to the RaiLinQ network. This extension opened on 6 October 2019. This also marked the retirement of the RA5-2Pcr on this line, being replaced by newer Class 153 trains.

ST 4500: Lanark - Welsbury

   ST 4500   Welsbury Branch 
Horizon Junction - Welsbury Cube Monument
Operating CompanyRaiLinQ
First OpenedUnknown
Finished at5 June 2018
Train TypeStoptrain
Stock UsedRA4-3
Status:Service Good.png Open
Frequencies
Rush Hour1*Hour
Monday-Friday1*Hour
Evening1*Hour
Saturday1*Hour
Sunday1*Hour

Open WheelTerm.png Horizon Junction
Open Line.png Lanark Downtown Hills
Open Line.png Swale (Lanark Military Base)
Open Line.png Spruce Hills
Open Line.png Lone Spruce
Open Line.png Eastwood
Open Wheelchair.png Pine Mountain South
Open Wheelchair.png Pine Mountain Airfield
Open WheelTermB.png Welsbury Cube Monument

Information

Horizon Junction, Lanark Downtown Hills, Swale, Spruce Hills and Lone Spruce opened at unknown dates. Eastwood Station opened at May 28th 2018. Pine Mountain South Station opened at June 1st 2018. Pine Mountain Airfield Station opened at June 4th 2018. Welsbury Cube Monument Station opened at June 5th 2018. This line used to be operated under a colaboration between ChimeRail and RaiLinQ. Some trains due to this may still have a different livery then the usual RaiLinQ livery, and some signs may still be marked as ChimeLinQ.

ST 4600: San Reinoldi - Sunshine Coast (Southeastern Line)

(Southeastern Line)

ST 4700: Utopia - Ezzo City

   ST 4700   Wafflemosa Line 
Utopia Stephenson - Ezzo City
Operating CompanyRaiLinQ
First Opened17 June 2017
Finished at10 May 2018
Train TypeStoptrain
Stock UsedRA5-3
Status:Service Good.png Open
Frequencies
Rush Hour4*Hour
Monday-Friday4*Hour
Evening2-4*Hour
Saturday4*Hour
Sunday2*Hour

Open WheelTerm.png Utopia Stephenson
Open Line.png Utopia Phelps Center
Open Wheelchair.png City of Musique
Open Line.png Spruce Mountain
Open Wheelchair.png Danielston
Open Wheelchair.png Formosa Capital
Open Wheelchair.png 42
Open Wheelchair.png Kenthurst Aerodrome
Open Line.png Kenthurst
Open Wheelchair.png Mississa Bay
Open WheelTermB.png Ezzo City

Information

Utopia - Formosa and all stops in between opened on 17th June 2017. 42 station opened at 18th June 2017. The three stations in Kenthurst, Kenthurst Aerodrome, Kenthurst and Mississa Bay have been opened at 14th July 2017. At the 10th of May 2018 Ezzo City opened meaning the line is now finished. At 26 September 2018, Utopia station was renamed to Utopia Stephenson station to avoid confusion with other stations in Utopia.

ST 4900: Quiris - Stoneedge

(Stoneedge Branch)

ST 5000: Ilirea

   ST 5000   Ilirea Shuttle 
Ilirea West - Ilirea ITC
Operating CompanyRaiLinQ
First Opened20 June 2017
Finished at20 June 2017
Train TypeStoptrain
Stock UsedRA6-1m1
Status:Service Good.png Open
Frequencies
Rush Hour4*Hour
Monday-Friday4*Hour
Evening0-4*Hour
Saturday4*Hour
Sunday4*Hour

Open WheelTerm.png Ilirea West
Open TermB.PNG Ilirea ITC

Information

This line opened at an unknown date in order to give connections between RailinQ and various other warptrain companies serving Ilirea. At an unknown date in 2020 Ilirea Cascadia station renamed to Ilirea ITC.|}

ST 5100: Daneburg - Ezzo City

   ST 5100   Daneburg Harbour Line 
Daneburg Harbour - Ezzo City
Operating CompanyRaiLinQ & BTRail
First Opened7 July 2017
Finished at13 May 2018
Train TypeStoptrain
Stock Used2* Class 628
Status:Service Good.png Open
Frequencies
Rush Hour2*Hour
Monday-Friday0-2*Hour
Evening0-1*Hour
Saturday0-2*Hour
Sunday0-1*Hour

Open Term.PNG Daneburg Harbour
Open Line.png Daneburg Central
Open Line.png Daneburg North
Open Line.png Kolpino North
Open Line.png Tenepi
Open Wheelchair.png Aprix
Open Wheelchair.png Glenbrook
Open WheelTermB.png Ezzo City

Information

Daneburg Central - Tenepi opened at July 7th 2017. Daneburg Harbour opened at September 19th 2017. Sulfureal Lakes station opened at January 4th 2018. Glenbrook Station opened at January 5th 2018. Ezzo City opened May 13th 2018 finishing the line. At 13 February 2019 Sulfureal Lakes Station was renamed to Aprix Station following a renaming of the town.

ST 5200: Verdantium - Fenwick

   ST 5200   Verdantium Commuter 
Verdantium Harbour - Fenwick Central
Operating CompanyRaiLinQ
First Opened20 July 2017
Finished at13 May 2018
Train TypeStoptrain
Stock UsedClass 507-D
Status:Service Good.png Open
Frequencies
Rush Hour4*Hour
Monday-Friday4*Hour
Evening2-4*Hour
Saturday2-4*Hour
Sunday2*Hour

Open WheelTerm.png Verdantium Harbour (AquaLinQ Connection)
Open Wheelchair.png Old Verdantium
Open Wheelchair.png Verdantium Northfields
Open Wheelchair.png Verdantium Bowie Arena
Open Line.png Llanfairpwllgwyngyllgogerychwyrndrobwllllantysiliogogogoch
Open WheelTermB.png Fenwick Central

Information

Old verdantium, Verdantium Northfields and Verdantium Bowie Arena opened as first 3 stations on the line at July 20th 2017. Verdantium Harbour opened on July 26th 2017. Llanfairpwllgwyngyllgogerychwyrndrobwllllantysiliogogogoch opened on November 15th 2017. The final station at Verdantium Fenwick Square opened at May 13th 2018. At 17 September 2020 Verdantium Fenwick Square was renamed to Fenwick Central.

ST 5400: Siletz - Bronte

   ST 5400   Mid-Eastern mainline 
Siletz Central - Bronte
Operating CompanyRaiLinQ
First Opened4 May 2020
Finished at-
Train TypeStoptrain
Stock UsedS110 + 3* CA8-DD
Status:Service Partial.png Partially open
Frequencies
Rush Hour4*Hour
Monday-Friday4*Hour
Evening2-4*Hour
Saturday4*Hour
Sunday4*Hour

Open WheelTerm.png Siletz Central
Open Wheelchair.png New Beginnings
Open Wheelchair.png Scarborough Fairstone Heights
Open Wheelchair.png Scarborough Denzil Junction
Open Wheelchair.png Saint Roux Gare Orsay
Closed Line.png Lakeview
Closed Line.png Marblelake Airport
Closed TermB.PNG Bronte

Information

On May 5th 2020 the first section of the line opened between Siletz Central and Saint Roux Gare Orsay, calling at Siletz Central, New Beginnings, Scarborough Fairstone Heights, Scarborough Denzil Junction and Saint Roux Gare Orsay.

ST 5500: Kolpino City - Pamsterlin

   ST 5500   Pamsterlin Branch 
Kolpino City - Pamsterlin
Operating CompanyRaiLinQ
First Opened27 July 2017
Finished at27 July 2017
Train TypeStoptrain
Stock UsedClass 153
Status:Service Good.png Open
Frequencies
Rush Hour2*Hour
Monday-Friday2*Hour
Evening0-2*Hour
Saturday2*Hour
Sunday2*Hour

Open WheelTerm.png Kolpino City
Open Line.png Mecklenburg
Open Line.png Southton
Open WheelTermB.png Pamsterlin

Information

The whole line opened on July 27th 2017.


ST 5600: Wazamawazi - Carnoustie

Far North Line

ST 5700: Mason City - Saint Anna

   ST 5700   North-Eastern Regional 
Mason City King Redtie III - St. Anna Mercy General
Operating CompanyRaiLinQ
First Opened15 November 2017
Finished at-
Train TypeStoptrain
Stock Used2* RA5-2Pcr
Status:Service Partial.png Partially open
Frequencies
Rush Hour4*Hour
Monday-Friday4*Hour
Evening2-4*Hour
Saturday2-4*Hour
Sunday2*Hour

Open WheelTerm.png St. Anna Mercy General
Open Wheelchair.png St. Anna Central
Open Wheelchair.png Creeperville Sakurajima
Open Wheelchair.png West Winterside
Open Wheelchair.png Hendon & Geneva
Closed Line.png Shadowpoint
Closed TermB.PNG Mason City

Information

St. Anna Mercy General and St. Anna Central opened at 15 November 2017. Creeperville Sakurajima opened at November 19th 2017. West Winterside opened at November 22nd 2017. Hendon & Geneva Station opened at May 22nd 2019.

ST 5800: Mason City - Secunda

   ST 5800   Fenwick Regional 
Mason City King Redtie III - Secunda
Operating CompanyRaiLinQ
First Opened17 September 2020
Finished at-
Train TypeStoptrain
Stock UsedClass 507D
Status:Service Partial.png Partially open
Frequencies
Rush Hour4*Hour
Monday-Friday4*Hour
Evening2-4*Hour
Saturday4*Hour
Sunday4*Hour

Closed Term.PNG Mason City King Redtie III
Closed Line.png North Haven
Closed Line.png Mason City Airport
Closed Line.png New Bakersville
Open Wheelchair.png Titsensaki
Open Wheelchair.png Heaven City Angelbridge
Open Wheelchair.png Fort Chipewyan
Open Wheelchair.png Blackheart
Open Wheelchair.png Nymphalia Essence Park
Open Wheelchair.png Nymphalia Florum
Open Wheelchair.png Padagonia
Open Wheelchair.png Cornerstone
Closed Line.png Merritt Lakes
Closed Line.png Fenwick Central
Closed TermB.PNG Secunda

Information

This line first opened on 17 September 2020 between Titsensaki, Heaven City Angelbridge, Fort Chipewyan, Blackheart, Nymphalia Essence Park, Nymphalia Florum, Padagonia and Cornerstone.

ST 6000: Christi - Ezzo City

   ST 6000   Serena Branch 
Christi - Ezzo City
Operating CompanyRaiLinQ
First Opened15 May 2018
Finished at23 September 2020
Train TypeStoptrain
Stock UsedTR9-2
Status:Service Good.png Open
Frequencies
Rush Hour2*Hour
Monday-Friday2*Hour
Evening2*Hour
Saturday2*Hour
Sunday2*Hour

Open WheelTerm.png Christi
Open Wheelchair.png Narona
Open Wheelchair.png Serena
Open Wheelchair.png Radiance Square
Open Wheelchair.png Kenthurst Port
Open Wheelchair.png Kenthurst Beach
Open WheelTermB.png Ezzo City

Information

The line fully opened between Kenthurst Beach and Ezzo City at 15 May 2018 as a local shuttle to give RaiLinQ a connection with the ferries at Kenthurst Beach. At 15 March 2019 it was decided to reroute some lines in the area. As a result this line was planned to be extended towards Calbar Arena to fix the issue that Ezzo City as a local hub is hard to reach from the north. At 18 September 2020 the planned extension to Calbar Arena was cancelled and the line was planned to be redirected to Christi instead. On 23 September 2020 Kenthurst Port, Radiance Square, Serena, Narona and Christi stations opened on this line.

Trivia

At Narona Station: From platform to street level, the coloured stripes lining the staircase spell out NARONA in base 3 (where Red = 0, Green = 1, and Blue = 2). Each triplet of stripes corresponds to a number, which maps to the letter in that position of the alphabet (so A = 1, B = 2, etc)

ST 6100: Laclede - Bakersville

   ST 6100   Seneca Branch 
Laclede Central - Bakersville Canarsie
Operating CompanyRaiLinQ & FrostyRail
First Opened26 January 2020
Finished at26 January 2020
Train TypeStoptrain
Stock UsedClass 153 + Class 156
Status:Service Good.png Open
Frequencies
Rush Hour2*Hour
Monday-Friday2*Hour
Evening2*Hour
Saturday2*Hour
Sunday2*Hour

Open WheelTerm.png Laclede Central
Open Wheelchair.png Laclede St. Francis Xavier Regional Airport
Open Wheelchair.png Capsville
Open Line.png Seneca Canalworks
Open Wheelchair.png Bakersville Airfield
Open WheelTermB.png Bakersville Canarsie

Information

This line was planned in 2018 to give extra connection to the southern areas of Bakersville and connect St. Francis Xavier Regional Airport to the network. It was later decided this line will be constructed and operated in Co-operation with FrostyRail. After a very slow planning and construction phase the line finally fully opened all at once on the 26th of January 2020.

ST 6200: Lanark - West Calbar

   ST 6200   New Washingcube Line 
Horizon Junction - Calbar Arena
Operating CompanyRaiLinQ
First Opened10 February 2019
Finished at15 March 2019
Train TypeStoptrain
Stock UsedBluTrain
Status:Service Good.png Open
Frequencies
Rush Hour2*Hour
Monday-Friday2*Hour
Evening2*Hour
Saturday2*Hour
Sunday2*Hour

Open WheelTerm.png Calbar Arena
Open Wheelchair.png Washingcube
Open Wheelchair.png Spruce Plains South
Open Wheelchair.png Spruce Plains North
Open WheelTermB.png Horizon Junction

Information

This line was planned in September 2018 to replace the old Washingcube Branch together with Stoptrain 6300. This line opened on February 10th 2019 between Calbar Arena, Washingcube and Spruce Plains. The line was finished on March 15th 2019 with the opening of Spruce Plains North and Horizon Junction on this line.

ST 6300: Waterville - West Calbar

   ST 6300   Freshney Branch 
Orio & Waterville - Calbar Arena
Operating CompanyRaiLinQ
First Opened15 February 2019
Finished at14 March 2019
Train TypeStoptrain
Stock UsedRL-V-RLQ
Status:Service Good.png Open
Frequencies
Rush Hour2*Hour
Monday-Friday2*Hour
Evening2*Hour
Saturday2*Hour
Sunday2*Hour

Open WheelTerm.png Calbar Arena
Open Wheelchair.png Freshney Marina
Open Wheelchair.png Freshney North
Open Wheelchair.png Spruce Plains South
Open Wheelchair.png Arendale
Open Wheelchair.png Harrington
Open Wheelchair.png Pasadena
Open Wheelchair.png Waterville Pontiac
Open TermB.PNG Orio & Waterville

Information

This line was planned in September 2018 to replace the old Washingcube Branch together with Stoptrain 6200. This line opened on February 15th 2019 between Calbar Arena, Freshney Marina, Freshney North, Spruce Plains South, Arendale and Harrington. Pasadena station opened on March 13th 2019. Finally at March 14th Waterville Pontiac and Orio & Waterville stations opened finishing the line.

ST 6400: Whiteley

   ST 6400   Whiteley Local 
Whiteley Turing Square - Whiteley Airport Parkway
Operating CompanyRaiLinQ
First Opened9 September 2018
Finished at10 February 2019
Train TypeStoptrain
Stock UsedClass 507D
Status:Service Good.png Open
Frequencies
Rush Hour4*Hour
Monday-Friday4*Hour
Evening4*Hour
Saturday4*Hour
Sunday4*Hour

Open WheelTerm.png Whiteley Turing Square
Open Line.png Whiteley Hudson Street
Open Wheelchair.png Whiteley College Park
Open WheelTermB.png Whiteley Airport Parkway

Information

This line opened on September 9th 2018 between Whiteley Turing Square, Whiteley Hudson Street and Whiteley College Park. Whiteley Airport Parkway station opened at the 10th of February 2019 finishing the line.

ST 6500: New Acreadium - Moramoa

   ST 6500   Moramoa Branch 
New Acreadium Schiphol - Moramoa Central
Operating CompanyRaiLinQ
First Opened13 March 2019
Finished at14 March 2019
Train TypeStoptrain
Stock UsedRA7-1ITA-DD
Status:Service Good.png Open
Frequencies
Rush Hour2*Hour
Monday-Friday2*Hour
Evening2*Hour
Saturday2*Hour
Sunday2*Hour

Open WheelTerm.png New Acreadium Schiphol
Open Wheelchair.png Antioch
Open Line.png Peripotamia
Open Wheelchair.png TwinLands
Open Wheelchair.png Moramoa Wyndham Street
Open WheelTermB.png Moramoa Central

Information

This line opened on March 13th 2019 between New Acreadium Schiphol, Antioch and Peripotamia stations. This line was subsequently finished the day after on March 14th 2019 with the opening of TwinLands, Moramoa Wyndham Street and Moramoa Central stations.

ST 6600: MRT Marina - Covina

   ST 6600   Covina Metropolitan 
MRT Marina - Vergil & Melrose
Operating CompanyRaiLinQ
First Opened16 March 2019
Finished at2 February 2020
Train TypeStoptrain
Stock UsedClass 507D
Status:Service Good.png Open
Frequencies
Rush Hour2*Hour
Monday-Friday2*Hour
Evening2*Hour
Saturday2*Hour
Sunday2*Hour

Open WheelTerm.png MRT Marina
Open Wheelchair.png Merchant City
Open Line.png Covina Theatre
Open Wheelchair.png Covina Elm Street
Open Wheelchair.png Victorian City Waterport
Open Wheelchair.png Victorian City Edwardian
Open Wheelchair.png Covina IKEA
Open WheelTermB.png Covina Theatre

Information

This line opened on March 16th 2019 between Merchant City and Covina Theatre. MRT Marina station opened on March 17th 2019 as the 175th open RaiLinQ station. On February 2nd 2019, the line was finished, opening new stations at Covina Elm Street, Victorian City Waterport, Victorian City Edwardian, Vergil IKEA and newly serving an existing station at Vergil & Melrose.

ST 6700: Whiteley - Bardot Springs

   ST 6700   The Bardot 
Whiteley Turing Square - Bardot Springs
Operating CompanyRaiLinQ
First Opened14 September 2019
Finished at14 September 2019
Train TypeStoptrain
Stock UsedClass 156
Status:Service Good.png Open
Frequencies
Rush Hour2*Hour
Monday-Friday2*Hour
Evening2*Hour
Saturday2*Hour
Sunday2*Hour

Open WheelTerm.png Whiteley Turing Square
Open Wheelchair.png Itomori South
Open WheelTermB.png Bardot Springs

Information

This line was planned after it became apparent a platform was left at Whiteley Turing Square in late 2018 and the towns of Itomori and Bardot Springs both requesting a connection in the months leading up to that time. Bardot Springs station was almost immediately constructed but Itomori south and the connecting tracks where only made at 12, 13 and 14 September 2019 due to prioritisation of other lines. The full line opened on September 14th 2019 between Whiteley Turing Square, Itomori South and Bardot Springs.

ST 9600: Greenmount

   ST 9600   Greenmount Shuttle 
UCWTIA/Greenmount - Greenmount Town
Operating CompanyRaiLinQ
First Opened8 May 2020
Finished at8 May 2020
Train TypeStoptrain
Stock UsedParry MiniTrain
Status:Service Good.png Open
Frequencies
Rush Hour4*Hour
Monday-Friday4*Hour
Evening4*Hour
Saturday4*Hour
Sunday4*Hour

Open WheelTerm.png UCWTIA/Greenmount
Open WheelTermB.png Greenmount Town

Information

Since the 4th of July 2017 UCWTIA/A5 station has been open, located in Sealane but with no exist to Sealane, and only an exit to UCWTIA via a long walkway. At August 10th 2017 a MetroLinQ (cart) metro line opened to Greenmount's MRT Station in order to connect the station to the town of Greenmount and the station was renamed to UCWTIA/Greenmount. After disappointing passenger use and some problems with the redstone it was decided in 2019 to convert the metro line to a little people mover shuttle line to be branded under RaiLinQ to make the network in the area easier to understand. The MetroLinQ metro closed down on May 6th 2020 and the new RaiLinQ stoptrain 9600 to replace it opened on May 8th 2020. The old station in Greenmount at the MRT station was abandoned and replaced by a new station with stepfree access slightly further east in the town.

ST 9700: Freedon - Northberg

   ST 9700   Northberg Shuttle 
Freedon Barfing Rainbow Fields - Northberg South
Operating CompanyRaiLinQ
First Opened19 November 2019
Finished at19 November 2019
Train TypeStoptrain
Stock UsedClass 507D
Status:Service Good.png Open
Frequencies
Rush Hour4*Hour
Monday-Friday4*Hour
Evening4*Hour
Saturday4*Hour
Sunday4*Hour

Open WheelTerm.png Freedon Barfing Rainbow Fields
Open WheelTermB.png Northberg South

Information

This line was planned after it became apparent that Northberg would not fit on the same route as Castlecombe on the Stoptrain 1400 without extremely awkward and wavy track alignments which where undesirable for a major Intercity rail line. It was decided in early 2019 for that reason to instead operate a shuttle between Freedon and Northberg, which actually made service better, as this also allowed a quick connection to IC0400 at Freedon. The line opened in it's entirety between Freedon Barfing Rainbow Fields and Northberg South on the 19th of November 2019.

ST 9800: Moramoa

   ST 9800   Parkour Tower Shuttle 
Moramoa Central - Moramoa Parkour Tower
Operating CompanyRaiLinQ
First Opened14 March 2019
Finished at14 March 2019
Train TypeStoptrain
Stock UsedParry MiniTrain
Status:Service Good.png Open
Frequencies
Rush Hour0-8*Hour
Monday-Friday8*Hour
Evening0-8*Hour
Saturday0-8*Hour
Sunday0-8*Hour

Open WheelTerm.png Moramoa Central
Open TermB.PNG Moramoa Parkour Tower

Information

This line is a very short shuttle line running on small rail-buses derived from the Parry People Mover intended to make the Moramoa Parkour Tower accessible by public transportation. Both stations opened at 14 March 2019 after the line was constructed in mid 2018 and sat unused since due to the fact the line was completely isolated, where RaiLinQ has a policy to not operate isolated rail lines. It's a great example of what can happen when towns, railway companies and a comically small train work together to create a useful service. The line is not wheelchair accessible due to the simple fact that the target destination is not accessible by wheelchair either way.

ST 9900: Central City - Eden

   ST 9900   Central City Shuttle 
Central City - Eden
Operating CompanyRaiLinQ
First Opened6 May 2018
Finished at7 May 2018
Train TypeStoptrain
Stock Used2* RA7-4DD
Status:Service Good.png Open
Frequencies
Rush Hour4*Hour
Monday-Friday4*Hour
Evening4*Hour
Saturday4*Hour
Sunday4*Hour

Open WheelTerm.png Central City
Open Wheelchair.png Grayzen
Open WheelTermB.png Eden

Information

The first bit of the line, Grayzen to Central City opened at May 6th 2018. The final station, Eden, opened at May 7th 2018.