User talk:Tdtspeedy

From Minecart Rapid Transit Wiki
Jump to navigation Jump to search

Tdt:

So basically you're rebuilding I-02 with a route about 50 blocks south? I thought MRT-2 was going to replace I-02. I'm lucky I got the idea to reincarnate it as MRT-2 or else it wouldn't be there at all... I recommend canceling the I-8 project. It serves almost the exact same places as MRT-2. The Northeast is too crowded as is. We don't need anymore highways up there. I apologize if I come across as blunt and rude, but I don't feel that I-8 is necessary. Jphgolf4321 (talk) 14:44, 29 March 2014 (EDT)


Looking at where I-8 is supposed to go, that looks like a replica of the highway I have planned. <IN-1> is supposed to connect with Redlin via the planned (IN-101), and go west to connect with Harborside and Eisitasi, meanwhile it will go east to Kitania and Quartz City. This is just a suggestion, but I would have it serve areas north of where you seem to have it planned to serve. I would also make it an MRT Route rather than an InterMap. It could even co-sign in part with MRT-1, or the Southwest Highway. Then it could go south to serve areas along the orange line before terminating at Eisitasi. This is just a suggestion so that you don't have to make a highway that is an exact replica of mine. KittyCat11231 (talk) 09:10, 30 March 2014 (EDT)


Well yes, I can shrink it back to MRT-8, that seems like a better plan, but then moving north to serve the areas up on places like the green line stations such as Whelburn and further westbound to Kalmar, and then being able to dip the highway back down towards Eisitasi may be a little bit harder than it could possibly seem, as I really do not plan to have the road go further east of Redlin. Based on the original route I've planned for MRT-8, it was supposed to go west in a straight way, as I'm either going to have to add small bridges over land or an underwater tunnel just to get outside Redlin. Redlin is surrounded on 3 sides, north, south, and east. If the only way out of Redlin is to go west of it, it would be really hard with the original planned route which would have served both eastern and western Eisitasi as a main area where the road can serve. I could possible cosign with a local road in Eisitasi itself. It is planned to end in Eisitasi west, and depending on the ways I can get to Eisitasi, a few other cities along the way should be served, however the road does not really intersect with any major roads. So I don't necessarily want to cosign with the Southwest Highway, but could possibly have an interchange and dip MRT-8 down to East Eisitasi and then continue down a local four lane road to West Eisitasi, where it is planned to end. Yes I see your road is planned to serve Harbourside, but my plan is not to serve there, but a nearby city that my friend (TumescentBarrel) owns after having the road serve Hillside-Pagoda.So based on that route, I'd rather have an interchange with <IN-1>. Tdtspeedy (talk) 10:31, 30 March 2014 (EDT)

Actually I feel like I could reconsider making it I-8 again... now it goes a pretty long distance, from practically the west edge to the east edge of the map. Tdtspeedy (talk) 16:01, 6 April 2014 (EDT)

POTATO

May I build a line to Redlin? KittyCat11231 - THE LLAMAS ARE COMING!!! Though they're stuck in traffic on the NJ Turnpike so give them time. (talk) 19:22, 24 July 2014 (EDT)

Okay. You may. Tdtspeedy (talk) 19:24, 24 July 2014 (EDT)
I'm away from a computer this week, can you reserve me a platform? KittyCat11231 - THE LLAMAS ARE COMING!!! Though they're stuck in traffic on the NJ Turnpike so give them time. (talk) 19:28, 24 July 2014 (EDT)


Okay, I'll keep platforms open for you. Tdtspeedy (talk) 20:37, 24 July 2014 (EDT)

MRTrainTime

Hey Tdtspeedy,

may I ask you to measure the time from my city to Central City?

My City: Circle Line C114 Change at: Circle Line C118; to: Zephyr North Line ZN11 Central City: Zephyr Line Z0

If you want to do that for me, please contact me ingame with the price for the measurement.

Thanks, KuchenKenta :D