XVLR Line 1

From Minecart Rapid Transit Wiki
Jump to navigation Jump to search
A photo of the Xj Riverside Metro and Light Rail stations at night.

The XjVille Light Rail Line 1 is the first and only light rail line in the XVMLR. The line was opened on February 7, 2023 and has 4 stops at XjVille Interchange Station, Xj's Funland, Xj Riverside Station, and XjVille Docks. This line was completely built by Bloo and was originally going to be 2 metro lines. Yes, for some reason Xj wanted the system to be a sideways-flipped ᚦ and for some reason it looks like it on the map.