Wikilogo.png

There are currently no GSMs scheduled. However, if you have proposals you'd like us to consider, send them along to staff@.

Wikilogo.png

Difference between revisions of "LeafTransit"

From Minecart Rapid Transit Wiki
Jump to: navigation, search
(forgot one)
(Talon, there's the best history that I have)
Line 41: Line 41:
 
| [[Vermilion]] Victory Square
 
| [[Vermilion]] Victory Square
 
| {{status|good}}
 
| {{status|good}}
|
+
| Started operating around November 2015
 
|-
 
|-
 
| LT-02
 
| LT-02
Line 55: Line 55:
 
| [[Scarborough]] Bus Depot
 
| [[Scarborough]] Bus Depot
 
| {{status|good}}
 
| {{status|good}}
|
+
| Started operating around December 2017
 
|-
 
|-
 
| LT-04
 
| LT-04
Line 62: Line 62:
 
| [[Scarborough]]
 
| [[Scarborough]]
 
| {{status|good}}
 
| {{status|good}}
|
+
| Started operating around
 
|-
 
|-
 
| LT-05
 
| LT-05
Line 69: Line 69:
 
| [[Whitechapel Downs Bus Terminal]]
 
| [[Whitechapel Downs Bus Terminal]]
 
| {{status|good}}
 
| {{status|good}}
 +
| Started operating around April 2018
 
|
 
|
|-
 
 
|-
 
|-
 
| LT-06
 
| LT-06
Line 77: Line 77:
 
| [[Schillerton]] [[Division Street Terminal]]
 
| [[Schillerton]] [[Division Street Terminal]]
 
| {{status|good}}
 
| {{status|good}}
|
+
| Started operating around May 2018
 
|-
 
|-
| LT-07
+
| LT-07 (probably a duplicate/mess up of numbering)
 
| [[Schillerton]] [[Division Street Terminal]]
 
| [[Schillerton]] [[Division Street Terminal]]
 
|
 
|
 
| [[Scarborough]] Air Base Bus Terminal
 
| [[Scarborough]] Air Base Bus Terminal
 
| {{status|good}}
 
| {{status|good}}
|
+
| Started operating around May 2018
 
|-
 
|-
 
| LT-08
 
| LT-08
Line 91: Line 91:
 
| [[Scarborough]]
 
| [[Scarborough]]
 
| {{status|good}}
 
| {{status|good}}
|
+
| Started operating around May 2018
 
|-
 
|-
 
| LT-09
 
| LT-09
Line 106: Line 106:
 
| [[Scarborough]] Bus Depot
 
| [[Scarborough]] Bus Depot
 
| {{status|good}}
 
| {{status|good}}
 +
| Started operating around May 2018
 
|-
 
|-
 
|}
 
|}

Revision as of 22:37, 12 June 2018

LeafTransit
LeafTransit Logo.jpg
Founder(s) sesese9
Slogan "We'll get you there!"
Date of Founding December 2014
Location of Headquarters Nippia and West Calbar
Parent Company LeafCorp

History

LeafTransit is a subsidiary of the parent corporation, LeafCorp. As the name states, LeafTransit handles transit-related matters on behalf of LeafCorp. Any transit company owned by LeafCorp is under LeafTransit. LeafTransit operates both intercity and intracity buses. If it connects two cities, then LeafTransit operates the buses. If it is intracity, then it is operated by a LeafTransit subsidiary such as West CalBus.

Subsidiaries

Fuel n' Go is a gas station that is entirely built by hand. The gas station was orginally founded in West Calbar but has expanded since then to other locations.
An up and coming airline that currently operates a flight out of Kitania Municipal Airport to Omerah but with more to come. Birchwood Airways is dedicated to fast and quality service without any delays. And as always, thank you for flying Birchwood Airways and stay leafy!
  • West CalBus
West CalBus is the bus operator for West Calbar. The subsidary is under the City of West Calbar but LeafTransit helps out with bus design.

Bus Route List

Route # N/W Terminus Stops In Between S/E Terminus Status Notes
LT-01 West Calbar Vermilion Victory Square Status: Service Good.png Good service Started operating around November 2015
LT-02 West Calbar Creeperville Bus Terminal (Under Construction) Status: Service New.png Planned
LT-03 Maplelyn Bus Depot Scarborough Bus Depot Status: Service Good.png Good service Started operating around December 2017
LT-04 Schillerton Division Street Terminal Scarborough Status: Service Good.png Good service Started operating around
LT-05 Maplelyn Bus Depot Whitechapel Downs Bus Terminal Status: Service Good.png Good service Started operating around April 2018
LT-06 Whitechapel Downs Bus Terminal Schillerton Division Street Terminal Status: Service Good.png Good service Started operating around May 2018
LT-07 (probably a duplicate/mess up of numbering) Schillerton Division Street Terminal Scarborough Air Base Bus Terminal Status: Service Good.png Good service Started operating around May 2018
LT-08 New Bakersville City Scarborough Status: Service Good.png Good service Started operating around May 2018
LT-09 Creeperville Bus Terminal (Under Construction)
  • East Spruce
Scarborough Air Base Bus Terminal Status: Service New.png Planned
LT-? Oakburgh Scarborough Bus Depot Status: Service Good.png Good service Started operating around May 2018