Mrt-logo.png

The next General Staff Meeting will be held on Sunday, October 13 at 7 p.m. UTC. Be sure to email topics to staff no later than Friday, October 11 at 7 p.m. UTC.

Mrt-logo.png

Difference between revisions of "User talk:LegendPheonix26"

From Minecart Rapid Transit Wiki
Jump to: navigation, search
(One intermediate revision by the same user not shown)
Line 2: Line 2:
  
 
Please do not edit others' pages without permission, especially when leaving templates that are largely unfinished. Furthermore, please do not create pages not in English. [[User:MinecraftYoshi26|MinecraftYoshi26]] ([[User talk:MinecraftYoshi26|talk]]) 03:02, 3 September 2019 (UTC)
 
Please do not edit others' pages without permission, especially when leaving templates that are largely unfinished. Furthermore, please do not create pages not in English. [[User:MinecraftYoshi26|MinecraftYoshi26]] ([[User talk:MinecraftYoshi26|talk]]) 03:02, 3 September 2019 (UTC)
 +
 +
==About A47==
 +
For,
 +
{{u|Time2makemymove}} and {{u|Frosty Creeper10}}
 +
 +
The A47 will go through your towns and it's on phase 4 after bridge phase/ Myzoria Bridge Construction. Remember it will pass through [[Seaview]] and [[Oasis Sands]].
 +
 +
Now for everybody else it will connect and end near A78 on the way to [[ilirea]] the A47 will have 4 phases and 1 bridge phase for Myzoria Bridge.
 +
It currently will be proposed this GSM on September 14th. #GSMSeptemberA47
 +
 +
Thanks, LegendPheonix26 out!
 +
 +
--[[User:LegendPheonix26|LegendPheonix26]] ([[User talk:LegendPheonix26|talk]]) 19:58, 12 September 2019 (UTC)

Revision as of 19:58, 12 September 2019

Welcome to my talk page! this is the LegendPheonix26

Please do not edit others' pages without permission, especially when leaving templates that are largely unfinished. Furthermore, please do not create pages not in English. MinecraftYoshi26 (talk) 03:02, 3 September 2019 (UTC)

About A47

For, Time2makemymove and Frosty Creeper10

The A47 will go through your towns and it's on phase 4 after bridge phase/ Myzoria Bridge Construction. Remember it will pass through Seaview and Oasis Sands.

Now for everybody else it will connect and end near A78 on the way to ilirea the A47 will have 4 phases and 1 bridge phase for Myzoria Bridge. It currently will be proposed this GSM on September 14th. #GSMSeptemberA47

Thanks, LegendPheonix26 out!

--LegendPheonix26 (talk) 19:58, 12 September 2019 (UTC)