SnowMetro

From Minecart Rapid Transit Wiki
Jump to navigation Jump to search

SnowMetro is a transit system in Snowdin being built by Toth_1 (formerly Purrcat2010) with some help from supermetro, the Deputy Mayor of Snowdin. It is (although slowly, but surely) largely still under construction. There is currently a single, four stop line in service, the Central Line, but a second line called the Downtown Line is in the works, as well as an extension on the Central Line. It is currently unknown how many lines will be in the system total.

Map

Idk when it will be added.



History

The metro, and transit in general in Snowdin, has a convoluted history. Back when Toth_1 was the DM and well before he switched to said account, he had the idea to build transit in Snowdin. He decided to make a monorail system for Snowdin, like the one in Cattington, but the then mayor of Snowdin, CrazyRocketGuy, accidentally tore the first station down. Much later, Toth (then known as Purrcat) decided to make a metro. This first iteration of the Central Line was both deeper and was planned to have three stops initially. One station was fully completed and one station was completed but without the exits along with a long tunnel heading to the north. Later, when Toth became the mayor of Snowdin, his new deputy mayor built the current Central Line without knowing of the other construction. However, Toth moved on when he saw how good this was, but he ended up building all of the new construction up to now, though that's been slow. Currently, there is a big wave of new construction of the SnowMetro, the biggest since Toth switched to his current account almost a year ago and in the history of Snowdin in general.