MRT Commuter Alert
MRTCA Current Status |
---|
MRT lines: ![]() Other major lines: ![]() Please see each section for more specific information. |
This page shows the status of the Official MRT lines, as well as 3rd Party rail lines, Metro systems, Buses, Trams, Highways, Airlines and Ferries all in one convenient place!
To edit, simply use other listings as a base template and change accordingly. For the status section, it is highly recommended to use the {{status}}
template, as it has all the required functions.
Please make sure the information on this page is correct and up to date, and that the show preview button is used to make sure the page does not break. Thanks!
Rail Lines
MRT Lines
Rail Line Name | Status | Information |
---|---|---|
MRT Arctic Line | Status: ![]() |
Trains are running on or close to schedule. |
MRT Circle Line | Status: ![]() |
Trains are running on or close to schedule. |
MRT Desert Line | Status: ![]() |
Trains are running on or close to schedule. |
MRT Expo Line | Status: ![]() |
Trains are running on or close to schedule. |
MRT Forest Line | Status: ![]() |
Trains are running on or close to schedule. |
MRT Island Line | Status: ![]() |
Trains are running on or close to schedule. |
MRT Jungle Line | Status: ![]() |
Trains are running on or close to schedule. |
MRT Lakeshore Line | Status: ![]() |
Trains are running on or close to schedule. |
MRT Marina Shuttle | Status: ![]() |
Trains are running on or close to schedule. |
MRT Mesa Line | Status: ![]() |
Trains are running on or close to schedule. |
MRT Plains Line | Status: ![]() |
Trains are running on or close to schedule. |
MRT Savannah Line | Status: ![]() |
Trains are running or or close to schedule. |
MRT Taiga Line | Status: ![]() |
Trains are running on or close to schedule. |
MRT Valley Line | Status: ![]() |
Trains are running on or close to schedule. |
MRT Zephyr Line | Status: ![]() |
Trains are running on or close to schedule. |
MRT Eastern Line | Status: ![]() |
Trains are running on or close to schedule. |
MRT Southern Line | Status: ![]() |
Trains are running on or close to schedule |
MRT Northern Line | Status: ![]() |
Section between NW41 Carnoustie - Airport and NE18 Titsensaki is open, however the extension to eastern Epsilon and Zeta, including NEX Nymphalia - Cetisy remains unbuilt. |
MRT Western Line | Status: ![]() |
Trains are running on or close to schedule. However, the southern portion has not been constructed yet, except for WS1. Please expect slight delays at WN23 while Metro Construction is undergoing and a station revamp. |
MRT Blue Line | Status: ![]() |
Trains are running on or close to schedule. However, there is a high risk of diversion into the cart dispenser due to a system malfunction at some stations. |
MRT Red Line | Status: ![]() |
Trains are running on or close to schedule. However, there is a high risk of diversion into the cart dispenser due to a system malfunction at some stations. |
MRT Yellow Line | Status: ![]() |
Trains are running on or close to schedule. However, there is a high risk of diversion into the cart dispenser due to a system malfunction at some stations. |
MRT Green Line | Status: ![]() |
Trains are running on or close to schedule. However, there is a high risk of diversion into the cart dispenser due to a system malfunction at some stations. |
MRT Orange Line | Status: ![]() |
Trains are running on or close to schedule. However, there is a high risk of diversion into the cart dispenser due to a system malfunction at some stations. |
Third party intercity lines
Rail Line Name | Status | Information |
---|---|---|
RegionalConnect | Status: ![]() |
Refer to the RegionalConnect wiki for more info. |
CitiRail | Status: ![]() |
Opened in 2019 after 5 years of construction. |
KTA Commuter Rail | Status: ![]() |
Rail service to Kitania suspended due to Winter Storm Minaj. Click here for more information |
GreatCentral | Status: ![]() |
Good service on all Whitley lines. |
Kenthurst-Evella Rail Link | Status: ![]() |
Express service between Kenthurst Xenonite Station [XW10] and City of Evella [M10] discontinued. Replaced by CitiRail Liverpool Line. |
Vanadinite | Status: ![]() |
Line 1 details will be made public soon |
ChimeRail | Status: ![]() |
Many lines are still under construction. |
RaiLinQ | Status: ![]() |
For more information, please take a look at our wiki page: RaiLinQ. |
Xilia-Watchfield Regional Metro | Status: ![]() |
Will be built once the SMP is official. |
HyTrak | Status: ![]() |
Grayzen > Spruce Neck |
Lanark-Laclede Express | Status: ![]() |
Insula Montes > C112 Lanark East > T17 Foobar > T13 Laclede |
![]() |
Silver Star Status: ![]() |
Open between Kenthurst and Xandar-Vekta. |
Adirondack Status: ![]() |
||
Terredunord Branch Status: ![]() |
||
Cardinal Status: ![]() |
||
Palmetto Status: ![]() |
Open between Wythern and Zaquar. | |
Tranquil Forest Branch Status: ![]() |
Open between Wythern and Royal Plaza. | |
Southwest Chief Status: ![]() |
Open between Heampstead and Deadbush Centro Station. | |
Piedmont Status: ![]() |
Open between Ravenna and Titsensaki. | |
Enspington Branch Status: ![]() |
||
Crescent Status: ![]() |
||
Starlight Status: ![]() |
||
Empire Status: ![]() |
||
EBTC Commuter | C35 Status: ![]() C36 Status: ![]() C37 Status: ![]() C38 Status: ![]() C39 Status: ![]() |
See EBTC Commuter for details. |
Fred Rail | Status: ![]() |
Click here for more info. |
Four Seasons Railways | Status: ![]() |
Freedon's station finished, pending approval to all other stations. |
BluRail | Status: ![]() |
See BluRail for more info. |
High Speed Rail Corporation | Status: ![]() |
Some segments operational, see main page for more info. |
Southern Plains Rail | Status: ![]() |
Shuttle Lines: (S1) Paixton Line - Status: ![]() Local Lines: |
MervRail | Status: ![]() |
Tokaido Shinkansen - Status: ![]() Full service will run between Central City and Bearainstein |
NTS Railways NFX | Status: ![]() |
Northberg-Freedon Express - Status: ![]() Commuter express railway between Northberg and Freedon. |
mylesMonorail | Status: ![]() |
Most stations planned |
mdRail | Status: ![]() |
Northern Line - Status: ![]() Pine Mtn./Welsbury GC-Waterville |
BreezeRail | Status: ![]() |
Service from Silent Plains to Tranquil Forest |
NewRail | Status: ![]() |
Please Look At The NewRail Wiki Page For More Info |
Veolia Railways | Status: ![]() |
Lines are under construction |
Prime Rail | Status: ![]() |
Coming soon. |
FrostyRail | North Coast Metropolitan Area YM Yamanote Line - Status: ![]() KT Keihin-Tohoku Line - Status: ![]() JB Error - Status: ![]() TK Tokaido Line - Status: ![]() CH Chuo Line - Status: ![]() CB Chuo-Banana Line - Status: ![]() BN Banana Line - Status: ![]() WI Winterside Line - Status: ![]() HE Hendon Line - Status: ![]() Intercity Lines NT Northern Line - Status: ![]() |
See FrostyRail for more details. |
PMW Commuter | Status: ![]() |
See this page for more info. |
Celeritas High Speed Rail | Status: ![]() |
Funding for Osmald's High Speed Rail project has been approved, with Phase 1 breaking ground soon. |
Metros
Rail Line Name | Status | Information | |
---|---|---|---|
KTA Nippia Metro | Status: ![]() |
Click here for more information | |
KTA Kitania Metro | Status: ![]() |
Click here for more information | |
Lakeborough Metro | Status: ![]() |
Lines 2 and 3 are fully operational. Line 1 is partially open between City Hall and Grenfell | |
Stratos Rapid Transit | Status: ![]() |
City line is partially open, Airport Express and Vista Line under construction. | |
ATA Ashmore Subway | Status: ![]() |
![]() ![]() | |
North Haven Subway | Status: ![]() |
Blue line trains from Illinois/WTC to Stadium/W. Haven operational. Line undergoing extension. More lines to follow. | |
AMS Airchester Metro Systems | Status: ![]() |
N Line: Trains stop at Business Station due to construction works C Line: Trains stop at Central Station due to construction works | |
Merchant Light Transit | MCY Status: ![]() MCR Status: ![]() |
Due to the Merchant City improvement program, the Merchant bus station is closed which has a knock on effect of the MCR line. Trains can not pass through the station so service has been reduced to between Merchant Hotel and New Merchant Station. This means Merchant Bus Station and Vanhill have been closed. | |
ORTA Metro | Status: ![]() |
Pink line is nearly finished, stations need to be open. Blue and Yellow Lines to start construction. | |
Vermilion Metro Rail | A E R V : ![]() All other lines: ![]() |
System undergoing construction. Some lines are operating with full or partial service. For details, see VMTA. | |
TTC | Status: ![]() |
See page for line charts and more details. | |
Birdhall Metro | Status: ![]() |
Trains up and running. | |
Chack City Subway | Status: ![]() |
Trains up and running. | |
Kenthurst Metrolink | Status: ![]() |
Circle Line C is operating normally. North-South Line N is operating normally. Kenthurst-Ezzo City Intercity Express X is operating normally. Mississa Bay Line M is operational from Mississa Bay to XW10 Station. For details, see Kenthurst. | |
Serena Metro | Status: ![]() |
==SLT Metro Alerts== | |
West Calbar Metrolink | Status: ![]() |
Trains up and running | |
Armada Metro | Status: ![]() |
Click here for detailed information. | |
42 ARM | Status: ![]() |
Click here for detailed information. | |
PieTwins Subway | Status: ![]() |
Click here for detailed information. | |
Lapis Metro | Status: ![]() |
All stations in the Venessa Bay district of Lapis Bay are open. | |
Formosa Transit Authority | Status: ![]() |
LR A partly built. Ruby and Diamond Lines under construction. | |
Richville Metro | Status: ![]() |
Line 1 expected to be open by Summer 2019 | |
Transport for Astoria City Organization | Status: ![]() |
Being revamped using Arrivé Delta technology by JohnNotTech. | |
Sigma Region Transit Authority (STA) | Status: ![]() |
A-B-C lines open between Lakeview Central and Lakeview University. Service to Saint Roux Gare Liberté is to be confirmed | |
AT Rail Line | Status: ![]() |
Line Is not being planned to AT and West Covina nor to the other side of the map. Have fun wishing I was going to do this. As I'm not :P | |
ETA Seaview Metro | Status: ![]() |
A line open between Harbour and City Hal. | |
Grayzen Rapid Transit | Status: ![]() |
Lines mainly open. See Grayzen Rapid Transit for more information. | |
![]() (JuhwaMetro) | |||
Status: ![]() |
Line ➀ and Line ➀E are not in service. Construction has begun for this route. | ||
Status: ![]() |
Line ➁ and Line ➁E are operating between [204] Sujang Fortress to [207] Hyangjeon. | ||
Status: ![]() |
Line ➂ and Line ➂E is operating except for [301] Gyeongshin and [302] Cheonjeon Row. | ||
Status: ![]() |
Line ➃ and Line ➃E is operating except for [401] Jambok (Cyclone Bloom) and [410] Gaehwa. | ||
Status: ![]() |
Line ➄ and Line ➄E are not in service. Construction has been ongoing for this route. | ||
Status: ![]() |
Line ➅ and Line ➅E are not in service. | ||
Status: ![]() |
Line ➆ and Line ➆E are not in service. Construction has been ongoing for this route. | ||
Status: ![]() |
Line ➇ and Line ➇E are not in service. Construction has been ongoing for this route. | ||
Status: ![]() |
Line ➈ and Line ➈E are not in service. | ||
Status: ![]() |
Line Ⓗ and Line ⒽE are not in service. Construction has begun for this route. | ||
Gold Springs Metro | Status: ![]() |
Partial service between Downtown and Conway Towers. Most stations are planned. | |
Esti Mi | Status: ![]() |
Click here for detailed info. | |
Spruce Plains Transit Authority - Metro Division | Status: ![]() |
Currently defunct. Orange Line planned. | |
Xilia Metro | Status: ![]() |
Blue line open between A8 Rest Area and University. Green line open from Ambassies to City Hall-MRT. Cyan line and red line are being planned. | |
Siletz-Royalston Metro | Status: ![]() |
All lines are closed at this time due to tunnel and rail renovations. Sorry for the inconvenience. Click here for more information. | |
ARTA | Status: ![]() |
== ARTA Service Alerts == | |
STC Metro | Status: ![]() |
Northbound D (Whiteley) is suspended due to an AFK Box. | |
GSRFT Underground | Status: ![]() |
Bakerloo District Metropolitan Status: ![]() ![]() | |
Spruce Neck Transit | Status: ![]() |
Metro Spruce Neck Transit Red Line Spruce Neck Transit Green Line Spruce Neck Transit Blue Line Spruce Neck Transit Yellow Line Spruce Neck Transit Orange Line Bus | |
DRail - Dabecco Transit System | Status: ![]() |
This line was shut down in 2016 and has since been demolished. A potential new transit system is currently being planned. | |
Benion Local Trains | Status: ![]() |
All lines running good. See Benion Local Trains for more info. BLT 3 now open! Still works in 1.11! | |
IZMetro | Status: ![]() |
[[Biome Line Is Currently Cancelled due to trackwork. | |
Lanark Metro | Status: ![]() |
Blue Line GreenLine Yellow Line Lanark-Laclede Express | |
Heampstead Metro | Status: ![]() Tunnel Under Rennovations Due To New Rolling Stock |
Victory Line Country Side - Status: ![]() Victory Line Union Plaza | |
Bakersville IRT | Status: ![]() |
![]() ![]() ![]() ![]() ![]() ![]() ![]() | |
Freedon Metro | Status: ![]() |
Eastern Line's trains isn't operating yet as the tracks aren't placed yet. Goldilocks Station's tunnels and stuff are still in the making. The lines are working, but the call cart system isn't installed in every station yet. | |
Tranquil Forest Metro | Status: ![]() |
Click here for more information. | |
OTA Subway | Status: ![]() |
Blue Line is open between South Side and MLSC/RaiLinQ. Green Line is under construction | |
WTA Metro | Status: ![]() |
3 lines are open,none are fully open,more are in planning. | |
STTA Subway | Status: ![]() |
(Red Line) open from C74 Station to MotorCity. <Red Line> planned. System new, still under construction. | |
Yaxier Railways | Status: ![]() |
Lines are operational within the built city. | |
XMetro | Status: ![]() |
M1 open between High Street and Horsham with an under construction extension to city hall and a station at Dover street. M2 open between City Hall and Parliament with an under construction extension to Gare 'd est via High Street. | |
Dulwich Metro | Status: ![]() |
Herne Bridge Line - Status: ![]() Forre Line - Status: | |
NTS Railways | Status: ![]() |
Bridge Line Status: ![]() NFX Status: ![]() MRTShuttle Status: ![]() | |
BLT Metro | Status: ![]() |
A - Status: ![]() B - Status: ![]() | |
FrostLINK | Status: ![]() |
1 Line > Open between City Hall Street and Business Square Hillside 2 Line > Under construction between Business Square Central and Mount Oak Base | |
Gato Light Rail | Status: ![]() |
Gato has been demolished, along with its metro. Loop Line : Status: ![]() Expo Line : Status: ![]() Acacia Line : Status: ![]() Marioni Line : Status: ![]() | |
Silent Plains Metro (SPM) | Status: ![]() |
A and B lines yet to be built. | |
Bearbury Metro | Status: ![]() |
City Line Status: ![]() | |
Chillington Metro | Status: ![]() |
There are currently 2 lines in planning. One North/South, and one East/West. Metro now currently under construction. | |
Rockham Metro | Status: ![]() |
see the page for more info of lines | |
East Spruce Metro | Status: ![]() |
See the page for more detail | |
Rødby Cityline (Bybanen) | Status: ![]() |
Line between Nytorv-IDP and Rødby South open, further expansion under construction | |
NBTA Subway | Status: ![]() |
Click here for more information. | |
Antioch Rapid Transit | Status: ![]() |
Click here for more information. | |
R-Net (New Acreadium Metro) | Status: ![]() |
Lines are still under construction | |
MetroCRP | Nanpō Line - Status: ![]() |
Nanpō Line tracks are being raised above the ![]() | |
Eden Regional Transit Bahnen | S-Bahn Line Statuses S1 Status: ![]() S2 Status: ![]() R-Bahn Line Statuses R2 Status: ![]() |
S-Bahn lines are approaching a partially open status. See the Eden wiki page for more info. | |
GSMTown Transport System | Status: ![]() |
GSMetro Status: ![]() GSMBus Status: ![]() FredRail GSMTown Status: ![]() MRTHS Train Island Shuttle Status: ![]() | |
TransportOsaka | Status: ![]() |
Osaka Metro Status: ![]() | |
Kevtropolis Rapid Transit | Status: ![]() |
KRT Lrail Status: ![]() | |
Lilygrove Metro | Green Status: ![]() |
Green line segment 1 is currently being built. Purple line is still planned | |
cMetro | 1 Status: ![]() 2 Status: ![]() |
Line 1 is open between Beachfront and Downtown. Construction is continuing toward Airport station Line 2 is still planned | |
Miu Wan MTR | Status: ![]() |
Smithfield Line is operational except for Mortes Station, Topaz and Wong Kiu Lines are still under construction. |
Trams & Light Rails
Tram Lines | Status | Information |
---|---|---|
ATB Accerton Trams | Status: ![]() Status: ![]() |
Northcross Line 1st phase currently being built between Rowsendplein and Douglas Road. All other sections are closed. All other lines being planned in conjunction with the ATB Accerton RCT. |
TfM-Bayhead Marblesheen Trams | Status: ![]() Status: ![]() |
Station St. & Bayside lines. All other lines. |
RTA Vergil Light Rail | Status: ![]() |
Good service on Southern Line; partial service on Western Line; no service on Northern Line. For more information, see Vergil's Regional Transit Authority. |
Waterville METRO | A Status: ![]() B Status: ![]() C Status: ![]() Orio Shuttle Status: ![]() |
Open Between Orio Yards and Downtown/A22 Currently Planned Opening Currently Postponed |
Richville Metro (Light Rail/Streetcar Division) | Status: ![]() |
Downtown Streetcar Phase 1 Open |
Formosa Transit Authority | Status: ![]() |
LR A partially built. All construction and development temporarily halted. |
Daneburg Tram | Status: ![]() |
Open between Daneburg Main Station and Chiemsee Street. |
Spruce Plains Transit Authority - LRT/Tram Division | Blue Line Status: ![]() |
Blue Line being completely rebuilt. Red Line planned. |
EstiNet qTrain | Status: ![]() |
Fast high-speed lines cross crossing Espil districts will be constructed soon to alleviate traffic. |
Wazamawazi Tram | Status: ![]() |
For actual information on lines and stops open: click here for more information: Wazamawazi and TramLinQ. |
WTA EL-RT (Elevated light rail) | Status: ![]() |
Will have multiple rail corridors with frequent stops,no stations built yet. |
Rockham Trams | Status: ![]() |
Trams back in service. |
VerdeRail | Status: ![]() |
One station constructed and ready, most of the rails and second station still in planning phase |
New Bakersville Light Rail | Status: ![]() |
Click here for more information. |
East Spruce Streetcar | Status: ![]() |
Good Service |
KRT Yarra Trams | Status: ![]() |
|
Lilygrove Light Rail | Blue Status: ![]() |
Blue Line under development. 2 stations open |
Villĕ Metro | Cyan Line - Status: ![]() Magenta Line - Status: ![]() VLR - Status: ![]() |
VLR is only open between Town Hall and Plaza de Festivas (branch 1). |
Highways
Highways | Status | Information |
---|---|---|
A0 | Status: ![]() |
Highway open around Central City. |
A1 | Status: ![]() |
Highway open between Central City and New Acreadium |
A230 | Status: ![]() |
Road is still under construction, currently on phase 3. Contact Kel5 for more info |
A3 | Status: ![]() |
Highway finally open along all stretches between A1 and ATC |
A4 | Status: ![]() |
Highway open between Central City and Marblegate. |
A5 | Status: ![]() |
Highway open between Central City and Utopia. |
A30 | Status: ![]() |
Highway under construction by CaptainChimpy. (Currently only the section between Airchester and Wythern is approved.). Open between Saint Roux and Wythern in both directions. Minor delays between J8-10 due to construction of a new junction with the B230. |
A35 | Status: ![]() |
Highway status unknown due to destruction of Appleton and building of ATC |
A7 | Status: ![]() |
Highway open between A8 and Ilirea, via Kenthurst. |
A8 | Status: ![]() |
Highway open between Spring Valley and Central City. |
A89 | Status: ![]() |
Highway open between Whitechapel and Snowtopic |
A890 | Status: ![]() |
Highway open between ![]() |
A892 | Status: ![]() |
A temporary bypass was made for A89 to start its service. |
A90 | Status: ![]() |
Highway Open between ![]() ![]() |
A92 | Status: ![]() |
Highway under construction. Two sections are open: the first between Carnoustie and Osaka and the second from Larkspur to Snowtopic. The best alternate route between the A89 and A1 is the A90 between Konawa and BirchView, but access to Kyoto is impossible. |
A94 | Status: ![]() |
Highway open between Whitechapel and A1 via Laclede |
A942 | Status: ![]() |
Highway open between Laclede and West Calbar. |
A50 | Status: ![]() |
Highway under construction by MRTKeikoku. |
A305(M) | Status: ![]() |
The main regional throughfare for Accerton. To conform with MRT highway regulations, it is nationally known as B305. Highway under construction by ValachSarkhor |
A95 | Status: ![]() |
Lanark > A90 > A94 > A942 > Laclede > A8 |
B10 | Status: ![]() |
Highway open between Peripotamia and New Acreadium. |
B20 | Status: ![]() |
Highway Phases 1+2 open from Los Angeles to Ellesume. Phase 3 under construction between Ellesume and Solarion |
B40 | Status: ![]() |
Highway partially open between Tranquil Forest and Silent Plains |
B450 | Status: ![]() |
Building from Royal Ferry to the highways. |
B50 | Status: ![]() |
Highway under construction out of southern Formosa. No intended destination yet. |
B51 | Status: ![]() |
Highway under construction between Sealane and Formosa. |
B57 | Status: ![]() |
Closed between Central City and Oakley for road reconstruction. |
B69 | Status: ![]() |
|
B83 | Status: ![]() |
Planned to run between Birchwood, Rosemary, and the A8. |
B707 | Status: ![]() | |
B717 | Status: ![]() | |
B727 | Status: ![]() | |
B71 | Status: ![]() |
Kenthurst Northern Link |
B72 | Status: ![]() |
Expo Eleven Arterial between Kenthurst and Ezzo City, built by Aliksong. |
B73 | Status: ![]() |
Kenthurst Parkway |
B79 | Status: ![]() |
Kenthurst Outer Ring Road, lovingly built by Aliksong. |
B89 | Status: ![]() |
Road under construction by ArdyArd and his team. |
B901 | Status: ![]() |
Links Whitechapel (Seneca Canal District), Maplelyn (West Calbar), and Christi together |
B902 | Status: ![]() |
Major atery for the Arctic Plains SMP from Freshney to West Calbar via Washingcube |
B91 | Status: ![]() |
Highway open between ![]() |
B92 | Status: ![]() |
Running between Armada to Lancaster, several extensions planned |
B920 | Status: ![]() |
Highway connecting the town of Alvingdale with the ![]() |
B750 | Status: ![]() |
Highway linking Eisli, Espil to ![]() |
B751 | Status: ![]() |
Highway connecting Espil, Espil Ecilidae Airport, Pixl, and Xandar. |
B752 | Status: ![]() |
Highway that runs through Pixl, connecting it to other highways. |
B753 | Status: ![]() |
Highway connecting Espil, Espil Ecilidae Airport, Waverly and Pixl. |
B754 | Status: ![]() |
Highway connecting Cephyl, Espil to ![]() |
B755 | Status: ![]() |
Highway connecting Evella to ![]() |
B756 | Status: ![]() |
Highway connecting Falloway & Janghwa City to Highway ![]() ![]() |
B935 | Status: ![]() |
Open between Pollard Road in Hampton and A89 in Spruce Plains. |
B17 | Status: ![]() |
Armada > ![]() ![]() |
B18 | Status: ![]() |
B17 Lanark Blvd > ![]() ![]() |
C923 | Status: ![]() |
ARMADEAN ROAD REVOLUTION! |
B31 Marina Highway |
Status: ![]() |
Highway open between Marina and Merchant Interchange (A3) Merchant Interchange Status: ![]() |
B32 | Status: ![]() |
Highway open between A30 and Freedon via Northberg. Recommended to use Ring 1 around Northberg. Follow signage. Freedon Airport Motorway: Under construction. |
B19 | Status: ![]() |
Highway open between Central City and Spruce Neck. |
B104 | Status: ![]() |
Open between exits 1 and 2. |
B11 | Status: ![]() |
Planned between A1 and Shadowpoint. |
B892 | Status: ![]() |
Planned from Willow to A92 under Borealia. |
B911 | Status: ![]() |
Service between A1 and Bakersville opened. |
B920 | Status: ![]() |
Road connecting Alvingdale to the A92 |
Flights
![]() |
Note: This section is highly outdated! Please refer to the MCAO wiki page for a more updated list | ![]() |
Company Name | Status |
---|---|
Waypoint Airlines | Status: ![]() |
IntraAir | Status: ![]() |
![]() |
Status: ![]() |
EnjinAirlines | Status: ![]() |
EvolvedAirways | Status: ![]() |
Derpy Air | Status: ![]() |
SkyTrans | Status: ![]() |
Expect In | Status: ![]() |
Infamous Airlines | Status: ![]() |
Veolia Airways | Status: ![]() |
FlyCreeper | Status: ![]() |
Michigana | Status: ![]() |
![]() |
Status: ![]() |
Buses
Company Name | Status | Information |
---|---|---|
ATA Ashmore Local Busses | Status: ![]() |
A2 Busses run from 3rd Street/Frumple Avenue to 3rd Street/Grand Avenue |
Vermilion Metro Bus | All lines: ![]() |
No lines in operation yet. For details, see VMTA. |
Waterville METRO | W1 Status: ![]() W2 Status: ![]() W3 Status: ![]() W4 Status: ![]() |
Service Suspended until Further Notice, Please use the A Streetcar between Downtown/A22 and City Hall/A23 |
Thunderbird Transit Commission | Status: ![]() |
However. two routes are planned. All other routes up and running. |
Esti Bi | Status: ![]() |
Good service on major lines though some major lines are under construction. Integrated with the Esti Card. |
OTA Bus | Status: ![]() |
Line 1 is running. All other lines are planned. |
Prime Bus | Status: ![]() |
Parts of PB01 are open. PB02 is planned. |
SavaBus | Status: ![]() |
The Northern Way almost open, requiring road connection or perms for connection to Aviation and Titsensaki. Bus in Kenthurst will be placed very soon, and bus in Quiris waits for construction of Quiris Bus Station. Savacaci Hub - Kolpino / Espil waits for Espil bus station Savacaci Hub - Siletz is planning connections to Covina for a triple branch. |
BLT Buses | Status: ![]() |
1 - Status: ![]() 2 - Status: ![]() |
NTS Buses | Status: ![]() |
East Line open between Central City and Northberg |
TransportOsaka | Status: ![]() |
OsakaBus Status: ![]() |
Kevtropolis Rapid Transit | Status: ![]() |
KRT Bus Status: ![]() |
Boats and Ferries
Company Name | Status | Information | |
---|---|---|---|
Smart Ferries | Status: ![]() |
Good service on all lines | |
Vermilion Waterways | Status: ![]() |
Routes 1, 2 and 4 are in operation. All other routes under construction. For details, see VMTA. | |
Yelo Waterbus | Status: ![]() |
||
Yelo Ferries | Southern Ocean Status: ![]() Northern String Status: ![]() Inner East Lake Status: ![]() | ||
Sagamore-Nantucket Ferry | Status: ![]() | ||
Hummingbird Boat Lines | 1 Rose Line - Status: ![]() 2 Lavander Line - Status: |
||
Welsbury Mini-Boats | Status: ![]() |
More info here:WTA | |
Azuma Boats | goodservice|}} | All services out of Villĕ running smoothly! |